IAC Assessment: LL0197
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0197
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2004
Principal Product Oil field equipment
NAICS 333132 - Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533 - Oil And Gas Field Machinery
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 25,000
Annual Production 1,200 Pieces
Production Hrs. Annual 2,080
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,542 400,809 kWh $0.04
Electricity Demand $27,088 4,820 kW-months/year $5.62
Electricity Fees $3,437 - $ -
TOTAL ENERGY COSTS $48,067
RECOMMENDED SAVINGS* $26,171 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,732
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$19,102
Cost:
$30
$10,188 232,752 $7,548 1,343 $1,366 - - - $10,188
232,752
kWh
$7,548
1,343
kW-months/year
$1,366
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,439
Cost:
$30
$1,336 30,530 - - $103 - - - $1,336
30,530
kWh
-
-
kW-months/year
$103
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,042
Cost:
$2,920
$1,896 43,323 - - $146 - - - $1,896
43,323
kWh
-
-
kW-months/year
$146
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,020
Cost:
$990
$587 13,420 $360 64 $73 - - - $587
13,420
kWh
$360
64
kW-months/year
$73
-
$
-
-
$
05: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$745
Cost:
$152
$692 15,812 - - $53 - - - $692
15,812
kWh
-
-
kW-months/year
$53
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$323
Cost:
$245
$102 2,330 - - $8 - $213 - $102
2,330
kWh
-
-
kW-months/year
$8
-
$
$213
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,500
Cost:
$30
- - - - - - $1,500 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,500
-
$
TOTAL RECOMMENDED Savings:
$26,171
Cost:
$4,397
$14,801 338,167 $7,908 1,407 $1,749 - $1,713 - $14,801
338,167
kWh
$7,908
1,407
kW-months/year
$1,749
-
$
$1,713
-
$
TOTAL IMPLEMENTED Savings:
$24,732
Cost:
$4,367
$13,465 307,637 $7,908 1,407 $1,646 - $1,713 - $13,465
307,637
kWh
$7,908
1,407
kW-months/year
$1,646
-
$
$1,713
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes