IAC logo
IAC Assessment: LL0223
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0223
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2005
Principal Product Ship repair
NAICS 336611 - Ship Building and Repairing
SIC 3731 - Ship Building And Repairing
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 6,750
Annual Production 1,000 Pieces
Production Hrs. Annual 4,992
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,040 2,579,095 kWh $0.06
Electricity Demand $52,980 9,427 kW-months/year $5.62
Electricity Fees $9,094 - $ -
Other Gas $14,594 682 MMBtu $21.40
TOTAL ENERGY COSTS $226,708
RECOMMENDED SAVINGS* $56,474 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,938
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,535
Cost:
$6,000
$16,780 288,408 - - $755 - - - - - - - - - $16,780
288,408
kWh
-
-
kW-months/year
$755
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$9,134
Cost:
-
- - - - - - - - $9,134 427 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$9,134
427
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,567
Cost:
$310
$1,990 34,207 $466 83 $111 - - - - - - - - - $1,990
34,207
kWh
$466
83
kW-months/year
$111
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,936
Cost:
$300
$1,853 31,853 - - $83 - - - - - - - - - $1,853
31,853
kWh
-
-
kW-months/year
$83
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,897
Cost:
-
$1,815 31,199 - - $82 - - - - - - - - - $1,815
31,199
kWh
-
-
kW-months/year
$82
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,044
Cost:
-
$999 17,002 - - $45 - - - - - - - - - $999
17,002
kWh
-
-
kW-months/year
$45
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,461
Cost:
-
- - - - $13 - $4,993 290 - - $455 - - - -
-
kWh
-
-
kW-months/year
$13
-
$
$4,993
290
MMBtu
-
-
MMBtu
$455
-
$
-
-
$
08: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$16,900
Cost:
$1,200
- - - - - - - - - - $14,400 - $2,500 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$14,400
-
$
$2,500
-
$
TOTAL RECOMMENDED Savings:
$56,474
Cost:
$7,810
$23,437 402,669 $466 83 $1,089 - $4,993 290 $9,134 427 $14,855 - $2,500 - $23,437
402,669
kWh
$466
83
kW-months/year
$1,089
-
$
$4,993
290
MMBtu
$9,134
427
MMBtu
$14,855
-
$
$2,500
-
$
TOTAL IMPLEMENTED Savings:
$38,938
Cost:
$7,810
$20,623 354,468 $466 83 $949 - - - - - $14,400 - $2,500 - $20,623
354,468
kWh
$466
83
kW-months/year
$949
-
$
-
-
MMBtu
-
-
MMBtu
$14,400
-
$
$2,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Gas Personnel Changes One-time Revenue or Avoided Cost