IAC logo
IAC Assessment: LL0226
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0226
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2005
Principal Product Rice Drying
NAICS 311212 - Rice Milling
SIC 2044 - Rice Milling
Sales $500,000-$1,000,000
# of Employees 11
Plant Area (Sq.Ft.) 25,000
Annual Production 10,816,000 Pounds
Production Hrs. Annual 3,984
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,800 444,570 kWh $0.11
Electricity Demand $9,800 2,467 kW-months/year $3.97
Electricity Fees $2,189 - $ -
Natural Gas $38,387 6,701 MMBtu $5.73
TOTAL ENERGY COSTS $98,176
RECOMMENDED SAVINGS* $18,594 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,994
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,228
Cost:
$1,600
$6,000 55,802 - - $228 - - - - - - - $6,000
55,802
kWh
-
-
kW-months/year
$228
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,074
Cost:
-
- - - - - - $6,074 1,060 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,074
1,060
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,146
Cost:
$700
$993 9,238 $111 28 $42 - - - - - - - $993
9,238
kWh
$111
28
kW-months/year
$42
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$745
Cost:
$300
- - - - - - $745 130 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$745
130
MMBtu
-
-
$
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$464
Cost:
-
$447 4,156 - - $17 - - - - - - - $447
4,156
kWh
-
-
kW-months/year
$17
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$62
Cost:
-
$60 560 - - $2 - - - - - - - $60
560
kWh
-
-
kW-months/year
$2
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$3,875
Cost:
$350
- - - - - - - - $1,375 - $2,500 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,375
-
$
$2,500
-
$
TOTAL RECOMMENDED Savings:
$18,594
Cost:
$2,950
$7,500 69,756 $111 28 $289 - $6,819 1,190 $1,375 - $2,500 - $7,500
69,756
kWh
$111
28
kW-months/year
$289
-
$
$6,819
1,190
MMBtu
$1,375
-
$
$2,500
-
$
TOTAL IMPLEMENTED Savings:
$11,994
Cost:
$2,950
$6,993 65,040 $111 28 $270 - $745 130 $1,375 - $2,500 - $6,993
65,040
kWh
$111
28
kW-months/year
$270
-
$
$745
130
MMBtu
$1,375
-
$
$2,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost