IAC logo
IAC Assessment: LL0230
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0230
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2005
Principal Product Pipe coating
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 50,000
Annual Production 70,000 Pieces
Production Hrs. Annual 4,992
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,948 1,309,680 kWh $0.08
Electricity Demand $1,818 3,307 kW-months/year $0.55
Electricity Fees $14,474 - $ -
Natural Gas $400,309 52,098 MMBtu $7.68
TOTAL ENERGY COSTS $518,549
RECOMMENDED SAVINGS* $115,532 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,903
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ $ $ MMBtu $ lb $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$25,864
Cost:
-
$24,917 345,637 $947 - - - - - - - - - $24,917
345,637
kWh
$947
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$22,903
Cost:
-
- - $22,903 - - - - - - - - - -
-
kWh
$22,903
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$19,048
Cost:
-
$18,351 254,556 $697 - - - - - - - - - $18,351
254,556
kWh
$697
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$11,584
Cost:
-
$11,160 154,804 $424 - - - - - - - - - $11,160
154,804
kWh
$424
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,309
Cost:
-
$8,005 111,035 $304 - - - - - - - - - $8,005
111,035
kWh
$304
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,419
Cost:
-
- - - - $2,419 332 - - - - - - -
-
kWh
-
-
$
$2,419
332
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,105
Cost:
-
$480 6,658 $18 - - - - - $607 - - - $480
6,658
kWh
$18
-
$
-
-
MMBtu
-
-
lb
$607
-
$
-
-
$
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$9,000
Cost:
-
- - - - - - $9,000 9 - - - - -
-
kWh
-
-
$
-
-
MMBtu
$9,000
9
lb
-
-
$
-
-
$
09: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$15,300
Cost:
-
- - - - - - - - $12,800 - $2,500 - -
-
kWh
-
-
$
-
-
MMBtu
-
-
lb
$12,800
-
$
$2,500
-
$
TOTAL RECOMMENDED Savings:
$115,532
Cost:
-
$62,913 872,690 $25,293 - $2,419 332 $9,000 9 $13,407 - $2,500 - $62,913
872,690
kWh
$25,293
-
$
$2,419
332
MMBtu
$9,000
9
lb
$13,407
-
$
$2,500
-
$
TOTAL IMPLEMENTED Savings:
$22,903
Cost:
-
- - $22,903 - - - - - - - - - -
-
kWh
$22,903
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost