Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisiana, Lafayette |
---|---|
Assessment Year | 2005 |
Principal Product | Pipe coating |
NAICS | 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479 - Metal Coating And Allied Services |
Sales | $5,000,000-$10,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 70,000 Pieces |
Production Hrs. Annual | 4,992 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $101,948 | 1,309,680 | kWh | $0.08 |
Electricity Demand | $1,818 | 3,307 | kW-months/year | $0.55 |
Electricity Fees | $14,474 | - | $ | - |
Natural Gas | $400,309 | 52,098 | MMBtu | $7.68 |
TOTAL ENERGY COSTS | $518,549 | |||
RECOMMENDED SAVINGS* | $115,532 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,903 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $25,864 Cost: - |
$24,917 | 345,637 | $947 | - | - | - | - | - | - | - | - | - |
$24,917 345,637 kWh |
$947 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $22,903 Cost: - |
- | - | $22,903 | - | - | - | - | - | - | - | - | - |
- - kWh |
$22,903 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $19,048 Cost: - |
$18,351 | 254,556 | $697 | - | - | - | - | - | - | - | - | - |
$18,351 254,556 kWh |
$697 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $11,584 Cost: - |
$11,160 | 154,804 | $424 | - | - | - | - | - | - | - | - | - |
$11,160 154,804 kWh |
$424 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $8,309 Cost: - |
$8,005 | 111,035 | $304 | - | - | - | - | - | - | - | - | - |
$8,005 111,035 kWh |
$304 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,419 Cost: - |
- | - | - | - | $2,419 | 332 | - | - | - | - | - | - |
- - kWh |
- - $ |
$2,419 332 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,105 Cost: - |
$480 | 6,658 | $18 | - | - | - | - | - | $607 | - | - | - |
$480 6,658 kWh |
$18 - $ |
- - MMBtu |
- - lb |
$607 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $9,000 Cost: - |
- | - | - | - | - | - | $9,000 | 9 | - | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
$9,000 9 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $15,300 Cost: - |
- | - | - | - | - | - | - | - | $12,800 | - | $2,500 | - |
- - kWh |
- - $ |
- - MMBtu |
- - lb |
$12,800 - $ |
$2,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $115,532 Cost: - |
$62,913 | 872,690 | $25,293 | - | $2,419 | 332 | $9,000 | 9 | $13,407 | - | $2,500 | - | $62,913 872,690 kWh |
$25,293 - $ |
$2,419 332 MMBtu |
$9,000 9 lb |
$13,407 - $ |
$2,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,903 Cost: - |
- | - | $22,903 | - | - | - | - | - | - | - | - | - | - - kWh |
$22,903 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | One-time Revenue or Avoided Cost |