IAC logo
IAC Assessment: LL0238
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0238
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2005
Principal Product Treated wood
NAICS 321114 - Wood Preservation
SIC 2491 - Wood Preserving
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 42,000
Annual Production 2,100,000 Pieces
Production Hrs. Annual 4,200
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $219,131 4,227,827 kWh $0.05
Electricity Demand $92,377 12,098 kW-months/year $7.64
Electricity Fees $11,855 - $ -
Natural Gas $557,501 91,515 MMBtu $6.09
TOTAL ENERGY COSTS $880,864
RECOMMENDED SAVINGS* $126,284 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,847
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ Tgal
01: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$60,523
Cost:
-
- - - - - - $60,523 9,929 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$60,523
9,929
MMBtu
-
-
$
-
-
Tgal
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$47,162
Cost:
$3,000
- - - - - - $47,162 7,737 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$47,162
7,737
MMBtu
-
-
$
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,179
Cost:
$1,500
$4,989 96,292 - - $190 - - - - - - - $4,989
96,292
kWh
-
-
kW-months/year
$190
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,207
Cost:
$500
- - - - - - $2,207 362 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,207
362
MMBtu
-
-
$
-
-
Tgal
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,065
Cost:
-
$1,622 31,298 $367 48 $76 - - - - - - - $1,622
31,298
kWh
$367
48
kW-months/year
$76
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$480
Cost:
-
$386 7,454 $76 10 $18 - - - - - - - $386
7,454
kWh
$76
10
kW-months/year
$18
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$354
Cost:
-
$341 6,581 - - $13 - - - - - - - $341
6,581
kWh
-
-
kW-months/year
$13
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$285
Cost:
-
$275 5,311 - - $10 - - - - - - - $275
5,311
kWh
-
-
kW-months/year
$10
-
$
-
-
MMBtu
-
-
$
-
-
Tgal
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$730
Cost:
-
$259 4,993 - - $10 - - - $461 - - - $259
4,993
kWh
-
-
kW-months/year
$10
-
$
-
-
MMBtu
$461
-
$
-
-
Tgal
10: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$7,299
Cost:
$1,000
- - - - - - - - - - $7,299 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$7,299
-
Tgal
TOTAL RECOMMENDED Savings:
$126,284
Cost:
$6,000
$7,872 151,929 $443 58 $317 - $109,892 18,028 $461 - $7,299 - $7,872
151,929
kWh
$443
58
kW-months/year
$317
-
$
$109,892
18,028
MMBtu
$461
-
$
$7,299
-
Tgal
TOTAL IMPLEMENTED Savings:
$61,847
Cost:
$6,000
$4,989 96,292 - - $190 - $49,369 8,099 - - $7,299 - $4,989
96,292
kWh
-
-
kW-months/year
$190
-
$
$49,369
8,099
MMBtu
-
-
$
$7,299
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Water Consumption