Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2006
Principal Product Wood chips and wood mill
NAICS 321113 - Sawmills
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $10,000,000-$50,000,000
# of Employees 37
Plant Area (Sq.Ft.) 5,000
Annual Production 350,000 Tons
Production Hrs. Annual 4,160
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $229,436 4,965,600 kWh $0.05
Electricity Demand $89,496 14,916 kW-months/year $6.00
Electricity Fees $12,104 - $ -
TOTAL ENERGY COSTS $331,036
RECOMMENDED SAVINGS* $6,757 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,569
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Fees Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ $ $ $ $ $
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,380
Cost:
$400
$62 1,331 $2 - $816 - $1,500 - $62
1,331
kWh
$2
-
$
$816
-
$
$1,500
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,013
Cost:
$330
$1,939 41,953 $74 - - - - - $1,939
41,953
kWh
$74
-
$
-
-
$
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$882
Cost:
$120
$850 18,399 $32 - - - - - $850
18,399
kWh
$32
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$838
Cost:
$30
$807 17,463 $31 - - - - - $807
17,463
kWh
$31
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$456
Cost:
$280
$439 9,507 $17 - - - - - $439
9,507
kWh
$17
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$139
Cost:
$105
$46 999 $2 - $91 - - - $46
999
kWh
$2
-
$
$91
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$49
Cost:
$120
$47 1,007 $2 - - - - - $47
1,007
kWh
$2
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$6,757
Cost:
$1,385
$4,190 90,659 $160 - $907 - $1,500 - $4,190
90,659
kWh
$160
-
$
$907
-
$
$1,500
-
$
TOTAL IMPLEMENTED Savings:
$6,569
Cost:
$1,160
$4,097 88,653 $156 - $816 - $1,500 - $4,097
88,653
kWh
$156
-
$
$816
-
$
$1,500
-
$
Savings
Cost
$ kWh $ $ $ $ $ $
Electricity Usage Electricity Fees Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Fees Personnel Changes One-time Revenue or Avoided Cost