IAC logo
IAC Assessment: LL0248
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0248
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2006
Principal Product Rice
NAICS 311212 - Rice Milling
SIC 2044 - Rice Milling
Sales $1,000,000-$5,000,000
# of Employees 14
Plant Area (Sq.Ft.) 25,000
Annual Production 52,650,000 Pounds
Production Hrs. Annual 4,160
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,771 560,671 kWh $0.11
Electricity Demand $14,067 781 kW-months/year $18.01
Electricity Fees $2,946 - $ -
Natural Gas $139,239 10,456 MMBtu $13.32
TOTAL ENERGY COSTS $217,023
RECOMMENDED SAVINGS* $37,377 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,622
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,816
Cost:
$14,656
$20,997 193,697 - - $819 - - - - - - - $20,997
193,697
kWh
-
-
kW-months/year
$819
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,463
Cost:
$1,022
$8,197 75,617 $1,873 104 $393 - - - - - - - $8,197
75,617
kWh
$1,873
104
kW-months/year
$393
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,218
Cost:
$80
$14 125 - - $1 - - - $203 - $1,000 - $14
125
kWh
-
-
kW-months/year
$1
-
$
-
-
MMBtu
$203
-
$
$1,000
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,082
Cost:
$20
$663 6,117 $378 21 $41 - - - - - - - $663
6,117
kWh
$378
21
kW-months/year
$41
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$959
Cost:
$151
- - - - - - $959 72 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$959
72
MMBtu
-
-
$
-
-
$
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$900
Cost:
$300
- - - - - - - - $900 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$900
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$619
Cost:
$150
$596 5,501 - - $23 - - - - - - - $596
5,501
kWh
-
-
kW-months/year
$23
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$320
Cost:
$50
- - - - - - $320 24 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$320
24
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$37,377
Cost:
$16,429
$30,467 281,057 $2,251 125 $1,277 - $1,279 96 $1,103 - $1,000 - $30,467
281,057
kWh
$2,251
125
kW-months/year
$1,277
-
$
$1,279
96
MMBtu
$1,103
-
$
$1,000
-
$
TOTAL IMPLEMENTED Savings:
$14,622
Cost:
$1,573
$8,874 81,859 $2,251 125 $435 - $959 72 $1,103 - $1,000 - $8,874
81,859
kWh
$2,251
125
kW-months/year
$435
-
$
$959
72
MMBtu
$1,103
-
$
$1,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost