IAC logo
IAC Assessment: LL0249
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0249
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2006
Principal Product paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2611 - Pulp Mills
Sales >$500,000,000
# of Employees 1,250
Plant Area (Sq.Ft.) 237,000
Annual Production 237,000 Tons
Production Hrs. Annual 8,736
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,449,569 262,233,578 kWh $0.11
Electricity Demand $4,451,944 478,247 kW-months/year $9.31
Electricity Fees $259,179 - $ -
Natural Gas $64,907,036 7,652,221 MMBtu $8.48
TOTAL ENERGY COSTS $98,067,728
RECOMMENDED SAVINGS* $498,289 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $269,466
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$158,452
Cost:
$8,830
- - - - - - $158,452 18,451 - - -
-
kWh
-
-
kW-months/year
-
-
$
$158,452
18,451
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$120,454
Cost:
$320
$119,499 1,101,370 - - $955 - - - - - $119,499
1,101,370
kWh
-
-
kW-months/year
$955
-
$
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$111,014
Cost:
$18,240
$110,192 1,015,590 - - $822 - - - - - $110,192
1,015,590
kWh
-
-
kW-months/year
$822
-
$
-
-
MMBtu
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$85,337
Cost:
$5,520
$84,660 780,281 - - $677 - - - - - $84,660
780,281
kWh
-
-
kW-months/year
$677
-
$
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,012
Cost:
$4,200
$4,334 39,946 - - $35 - - - $3,643 - $4,334
39,946
kWh
-
-
kW-months/year
$35
-
$
-
-
MMBtu
$3,643
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,963
Cost:
$105
$5,772 53,202 $1,136 122 $55 - - - - - $5,772
53,202
kWh
$1,136
122
kW-months/year
$55
-
$
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,919
Cost:
$1,740
$5,872 54,120 - - $47 - - - - - $5,872
54,120
kWh
-
-
kW-months/year
$47
-
$
-
-
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,138
Cost:
$1,422
- - - - - - $2,138 249 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,138
249
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$498,289
Cost:
$40,377
$330,329 3,044,509 $1,136 122 $2,591 - $160,590 18,700 $3,643 - $330,329
3,044,509
kWh
$1,136
122
kW-months/year
$2,591
-
$
$160,590
18,700
MMBtu
$3,643
-
$
TOTAL IMPLEMENTED Savings:
$269,466
Cost:
$27,070
$110,192 1,015,590 - - $822 - $158,452 18,451 - - $110,192
1,015,590
kWh
-
-
kW-months/year
$822
-
$
$158,452
18,451
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes