IAC logo
IAC Assessment: LL0260
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0260
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2006
Principal Product Steel Joist and Gerters
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $50,000,000-$100,000,000
# of Employees 503
Plant Area (Sq.Ft.) 193,430
Annual Production 82,000 Tons
Production Hrs. Annual 4,992
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $286,277 6,316,280 kWh $0.05
Electricity Demand $96,404 17,361 kW-months/year $5.55
Electricity Fees $31,015 - $ -
Natural Gas $92,512 8,388 MMBtu $11.03
TOTAL ENERGY COSTS $506,208
RECOMMENDED SAVINGS* $30,189 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,162
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$11,704
Cost:
$5,420
$3,075 67,891 - - $249 - $6,880 - $1,500 - $3,075
67,891
kWh
-
-
kW-months/year
$249
-
$
$6,880
-
$
$1,500
-
$
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$7,890
Cost:
$5,109
- - - - - - $7,890 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,890
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,503
Cost:
$3,652
$3,075 67,891 - - $428 - - - - - $3,075
67,891
kWh
-
-
kW-months/year
$428
-
$
-
-
$
-
-
$
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,127
Cost:
$630
$2,893 63,860 - - $234 - - - - - $2,893
63,860
kWh
-
-
kW-months/year
$234
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,371
Cost:
$600
$1,268 27,996 - - $103 - - - - - $1,268
27,996
kWh
-
-
kW-months/year
$103
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,087
Cost:
$770
$332 7,323 $56 10 $31 - $668 - - - $332
7,323
kWh
$56
10
kW-months/year
$31
-
$
$668
-
$
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$756
Cost:
$359
$560 12,369 $139 25 $57 - - - - - $560
12,369
kWh
$139
25
kW-months/year
$57
-
$
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$751
Cost:
$600
$695 15,352 - - $56 - - - - - $695
15,352
kWh
-
-
kW-months/year
$56
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$30,189
Cost:
$17,140
$11,898 262,682 $195 35 $1,158 - $15,438 - $1,500 - $11,898
262,682
kWh
$195
35
kW-months/year
$1,158
-
$
$15,438
-
$
$1,500
-
$
TOTAL IMPLEMENTED Savings:
$14,162
Cost:
$6,790
$4,675 103,210 $56 10 $383 - $7,548 - $1,500 - $4,675
103,210
kWh
$56
10
kW-months/year
$383
-
$
$7,548
-
$
$1,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost