IAC logo
IAC Assessment: LL0263
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0263
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2007
Principal Product Roofing products
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $50,000,000-$100,000,000
# of Employees 89
Plant Area (Sq.Ft.) 213,000
Annual Production 240,000 Tons
Production Hrs. Annual 6,000
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $654,177 12,095,444 kWh $0.05
Natural Gas $2,191,725 195,734 MMBtu $11.20
TOTAL ENERGY COSTS $2,845,902
RECOMMENDED SAVINGS* $781,312 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $607,127
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$436,374
Cost:
$470,000
- - $436,374 38,962 - - -
-
kWh
$436,374
38,962
MMBtu
-
-
Tgal
02: 2.1132 REPAIR FAULTY LOUVERS AND DAMPERS Savings:
$108,338
Cost:
$193,440
- - $108,338 9,673 - - -
-
kWh
$108,338
9,673
MMBtu
-
-
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$88,211
Cost:
$4,182
- - $88,211 7,876 - - -
-
kWh
$88,211
7,876
MMBtu
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$73,876
Cost:
$28,200
$73,876 1,365,543 - - - - $73,876
1,365,543
kWh
-
-
MMBtu
-
-
Tgal
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$63,098
Cost:
$129,785
- - $58,699 5,241 $4,399 3,666,187 -
-
kWh
$58,699
5,241
MMBtu
$4,399
3,666,187
Tgal
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$6,235
Cost:
$990
$6,235 115,248 - - - - $6,235
115,248
kWh
-
-
MMBtu
-
-
Tgal
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,431
Cost:
$745
$2,431 44,928 - - - - $2,431
44,928
kWh
-
-
MMBtu
-
-
Tgal
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,145
Cost:
$660
$2,145 39,645 - - - - $2,145
39,645
kWh
-
-
MMBtu
-
-
Tgal
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$338
Cost:
$390
$338 6,256 - - - - $338
6,256
kWh
-
-
MMBtu
-
-
Tgal
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$266
Cost:
$360
$266 4,916 - - - - $266
4,916
kWh
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$781,312
Cost:
$828,752
$85,291 1,576,536 $691,622 61,752 $4,399 3,666,187 $85,291
1,576,536
kWh
$691,622
61,752
MMBtu
$4,399
3,666,187
Tgal
TOTAL IMPLEMENTED Savings:
$607,127
Cost:
$504,117
$82,542 1,525,719 $524,585 46,838 - - $82,542
1,525,719
kWh
$524,585
46,838
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal