Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisiana, Lafayette |
---|---|
Assessment Year | 2007 |
Principal Product | Flow Master |
NAICS | 334513 - Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial |
SIC | 3823 - Process Control Instruments |
Sales | $1,000,000-$5,000,000 |
# of Employees | 11 |
Plant Area (Sq.Ft.) | 25,000 |
Annual Production | 50,000 Pieces |
Production Hrs. Annual | 3,000 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $9,428 | 119,127 | kWh | $0.08 |
Electricity Fees | $319 | - | $ | - |
Natural Gas | $2,835 | 134 | MMBtu | $21.16 |
TOTAL ENERGY COSTS | $12,582 | |||
RECOMMENDED SAVINGS* | $5,959 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,142 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Personnel Changes | Electricity Usage | Electricity Fees | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $1,724 Cost: $222 |
$1,667 | 21,060 | $57 | - | - | - |
$1,667 21,060 kWh |
$57 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $2,408 Cost: $240 |
$878 | 11,100 | $30 | - | $1,500 | - |
$878 11,100 kWh |
$30 - $ |
$1,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $599 Cost: $545 |
$579 | 7,322 | $20 | - | - | - |
$579 7,322 kWh |
$20 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $489 Cost: $240 |
$473 | 5,980 | $16 | - | - | - |
$473 5,980 kWh |
$16 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $397 Cost: $15 |
$384 | 4,847 | $13 | - | - | - |
$384 4,847 kWh |
$13 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $129 Cost: $36 |
$125 | 1,584 | $4 | - | - | - |
$125 1,584 kWh |
$4 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $116 Cost: $70 |
$53 | 666 | $2 | - | $61 | - |
$53 666 kWh |
$2 - $ |
$61 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $97 Cost: $30 |
$94 | 1,192 | $3 | - | - | - |
$94 1,192 kWh |
$3 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $5,959 Cost: $1,398 |
$4,253 | 53,751 | $145 | - | $1,561 | - | $4,253 53,751 kWh |
$145 - $ |
$1,561 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,142 Cost: $586 |
$1,529 | 19,330 | $52 | - | $1,561 | - | $1,529 19,330 kWh |
$52 - $ |
$1,561 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Personnel Changes | Electricity Usage | Electricity Fees | Personnel Changes |