Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2007
Principal Product Flow Master
NAICS 334513 - Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823 - Process Control Instruments
Sales $1,000,000-$5,000,000
# of Employees 11
Plant Area (Sq.Ft.) 25,000
Annual Production 50,000 Pieces
Production Hrs. Annual 3,000
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $9,428 119,127 kWh $0.08
Electricity Fees $319 - $ -
Natural Gas $2,835 134 MMBtu $21.16
TOTAL ENERGY COSTS $12,582
RECOMMENDED SAVINGS* $5,959 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,142
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Personnel Changes Electricity Usage Electricity Fees Personnel Changes
$ kWh $ $ $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,724
Cost:
$222
$1,667 21,060 $57 - - - $1,667
21,060
kWh
$57
-
$
-
-
$
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,408
Cost:
$240
$878 11,100 $30 - $1,500 - $878
11,100
kWh
$30
-
$
$1,500
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$599
Cost:
$545
$579 7,322 $20 - - - $579
7,322
kWh
$20
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$489
Cost:
$240
$473 5,980 $16 - - - $473
5,980
kWh
$16
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$397
Cost:
$15
$384 4,847 $13 - - - $384
4,847
kWh
$13
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$129
Cost:
$36
$125 1,584 $4 - - - $125
1,584
kWh
$4
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$116
Cost:
$70
$53 666 $2 - $61 - $53
666
kWh
$2
-
$
$61
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$97
Cost:
$30
$94 1,192 $3 - - - $94
1,192
kWh
$3
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$5,959
Cost:
$1,398
$4,253 53,751 $145 - $1,561 - $4,253
53,751
kWh
$145
-
$
$1,561
-
$
TOTAL IMPLEMENTED Savings:
$3,142
Cost:
$586
$1,529 19,330 $52 - $1,561 - $1,529
19,330
kWh
$52
-
$
$1,561
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Electricity Fees Personnel Changes Electricity Usage Electricity Fees Personnel Changes