IAC Assessment: LL0271
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2007
Principal Product Pharmaceuticlals
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 310,000
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 5,000
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $719,325 13,765,500 kWh $0.05
Natural Gas $465,514 45,917 MMBtu $10.14
TOTAL ENERGY COSTS $1,184,839
RECOMMENDED SAVINGS* $126,778 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,952
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$78,849
Cost:
$24,500
- - $78,849 7,776 - - -
-
kWh
$78,849
7,776
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$17,275
Cost:
$1,587
$17,275 330,552 - - - - $17,275
330,552
kWh
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,710
Cost:
$3,760
$9,710 185,803 - - - - $9,710
185,803
kWh
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,569
Cost:
$3,000
$7,569 144,834 - - - - $7,569
144,834
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,159
Cost:
$5,905
$4,159 79,587 - - - - $4,159
79,587
kWh
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,133
Cost:
$15
$4,133 79,089 - - - - $4,133
79,089
kWh
-
-
MMBtu
-
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,580
Cost:
$2,366
- - - - $2,580 - -
-
kWh
-
-
MMBtu
$2,580
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,886
Cost:
$1,500
- - $1,886 186 - - -
-
kWh
$1,886
186
MMBtu
-
-
$
09: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$365
Cost:
$638
$365 6,989 - - - - $365
6,989
kWh
-
-
MMBtu
-
-
$
10: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$252
Cost:
$454
$252 4,822 - - - - $252
4,822
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$126,778
Cost:
$43,725
$43,463 831,676 $80,735 7,962 $2,580 - $43,463
831,676
kWh
$80,735
7,962
MMBtu
$2,580
-
$
TOTAL IMPLEMENTED Savings:
$18,952
Cost:
$14,623
$14,486 277,201 $1,886 186 $2,580 - $14,486
277,201
kWh
$1,886
186
MMBtu
$2,580
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes