IAC Assessment: LL0275
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0275
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2007
Principal Product Motor oils
NAICS 324191 - Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992 - Lubricating Oils And Greases
Sales $100,000,000-$500,000,000
# of Employees 22
Plant Area (Sq.Ft.) 506,163
Annual Production 30,000 Thousand Gallons
Production Hrs. Annual 4,160
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,367 1,256,300 kWh $0.08
Electricity Demand $14,692 3,835 kW-months/year $3.83
Electricity Fees $7,977 - $ -
Natural Gas $85,594 10,312 MMBtu $8.30
TOTAL ENERGY COSTS $206,630
RECOMMENDED SAVINGS* $21,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,286
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$9,761
Cost:
$500
- - - - - - $9,761 1,176 - - -
-
kWh
-
-
kW-months/year
-
-
$
$9,761
1,176
MMBtu
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$6,002
Cost:
$750
$5,604 71,573 - - $398 - - - - - $5,604
71,573
kWh
-
-
kW-months/year
$398
-
$
-
-
MMBtu
-
-
$
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,372
Cost:
$240
$2,215 28,288 - - $157 - - - - - $2,215
28,288
kWh
-
-
kW-months/year
$157
-
$
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,791
Cost:
$690
$1,672 21,355 - - $119 - - - - - $1,672
21,355
kWh
-
-
kW-months/year
$119
-
$
-
-
MMBtu
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,014
Cost:
$90
$947 12,097 - - $67 - - - - - $947
12,097
kWh
-
-
kW-months/year
$67
-
$
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$523
Cost:
$507
- - - - - - $523 63 - - -
-
kWh
-
-
kW-months/year
-
-
$
$523
63
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$386
Cost:
$200
$360 4,604 - - $26 - - - - - $360
4,604
kWh
-
-
kW-months/year
$26
-
$
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$121
Cost:
$70
$52 666 $4 1 $4 - - - $61 - $52
666
kWh
$4
1
kW-months/year
$4
-
$
-
-
MMBtu
$61
-
$
TOTAL RECOMMENDED Savings:
$21,970
Cost:
$3,047
$10,850 138,583 $4 1 $771 - $10,284 1,239 $61 - $10,850
138,583
kWh
$4
1
kW-months/year
$771
-
$
$10,284
1,239
MMBtu
$61
-
$
TOTAL IMPLEMENTED Savings:
$10,286
Cost:
$1,750
$9,543 121,882 $4 1 $678 - - - $61 - $9,543
121,882
kWh
$4
1
kW-months/year
$678
-
$
-
-
MMBtu
$61
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes