IAC logo
IAC Assessment: LL0278
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0278
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2007
Principal Product Rope
NAICS 314994 - Rope, Cordage, Twine, Tire Cord, and Tire Fabric Mills
SIC 2298 - Cordage And Twine
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 78,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $304,951 3,657,365 kWh $0.08
Natural Gas $94,323 9,432 MMBtu $10.00
TOTAL ENERGY COSTS $399,274
RECOMMENDED SAVINGS* $73,044 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,442
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $ $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,656
Cost:
$10,860
$30,232 362,583 - - - - $(-576) - - - - - $30,232
362,583
kWh
-
-
MMBtu
-
-
$
$(-576)
-
$
-
-
$
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$14,779
Cost:
$1,384
$14,779 177,249 - - - - - - - - - - $14,779
177,249
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
03: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$9,981
Cost:
$150
$8,481 101,712 - - - - - - - - $1,500 - $8,481
101,712
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
$1,500
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,854
Cost:
$2,400
$8,854 106,186 - - - - - - - - - - $8,854
106,186
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$2,388
Cost:
$542
$2,388 28,645 - - - - - - - - - - $2,388
28,645
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
06: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,920
Cost:
$1,147
- - - - - - - - $1,920 - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
$1,920
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,744
Cost:
$1,050
$833 9,986 - - $911 - - - - - - - $833
9,986
kWh
-
-
MMBtu
$911
-
$
-
-
$
-
-
$
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,696
Cost:
$912
$1,696 20,340 - - - - - - - - - - $1,696
20,340
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,240
Cost:
$428
- - $1,240 124 - - - - - - - - -
-
kWh
$1,240
124
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
10: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$583
Cost:
$668
$583 6,989 - - - - - - - - - - $583
6,989
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
11: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$203
Cost:
$120
$203 2,440 - - - - - - - - - - $203
2,440
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$73,044
Cost:
$19,661
$68,049 816,130 $1,240 124 $911 - $(-576) - $1,920 - $1,500 - $68,049
816,130
kWh
$1,240
124
MMBtu
$911
-
$
$(-576)
-
$
$1,920
-
$
$1,500
-
$
TOTAL IMPLEMENTED Savings:
$56,442
Cost:
$17,181
$52,687 631,892 - - $911 - $(-576) - $1,920 - $1,500 - $52,687
631,892
kWh
-
-
MMBtu
$911
-
$
$(-576)
-
$
$1,920
-
$
$1,500
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost