Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisiana, Lafayette |
---|---|
Assessment Year | 2008 |
Principal Product | PVC Pipe and fittings |
NAICS | 326122 - Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084 - Plastics Pipe |
Sales | $50,000,000-$100,000,000 |
# of Employees | 137 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 50,000,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,098,237 | 18,716,544 | kWh | $0.06 |
Natural Gas | $100,709 | 9,080 | MMBtu | $11.09 |
TOTAL ENERGY COSTS | $1,198,946 | |||
RECOMMENDED SAVINGS* | $135,128 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $59,367 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $59,266 Cost: $14,840 |
$59,266 | 1,009,982 | - | - | - | - |
$59,266 1,009,982 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $57,876 Cost: $20,949 |
$57,876 | 986,307 | - | - | - | - |
$57,876 986,307 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $9,892 Cost: $1,118 |
- | - | $9,892 | 892 | - | - |
- - kWh |
$9,892 892 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,714 Cost: $30 |
$5,714 | 97,378 | - | - | - | - |
$5,714 97,378 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $1,456 Cost: $825 |
$1,456 | 24,815 | - | - | - | - |
$1,456 24,815 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $823 Cost: $1,246 |
$823 | 14,018 | - | - | - | - |
$823 14,018 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $101 Cost: $70 |
$39 | 666 | - | - | $62 | - |
$39 666 kWh |
- - MMBtu |
$62 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $135,128 Cost: $39,078 |
$125,174 | 2,133,166 | $9,892 | 892 | $62 | - | $125,174 2,133,166 kWh |
$9,892 892 MMBtu |
$62 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $59,367 Cost: $14,910 |
$59,305 | 1,010,648 | - | - | $62 | - | $59,305 1,010,648 kWh |
- - MMBtu |
$62 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes |