IAC Assessment: LL0334
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0334
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2010
Principal Product Tire Bladder
NAICS 326291 - Rubber Product Manufacturing for Mechanical Use
SIC 3061 - Mechanical Rubber Goods
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 200,000
Annual Production 177,000 Pieces
Production Hrs. Annual 7,488
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $588,983 7,440,048 kWh $0.08
Electricity Demand $109,920 18,615 kW-months/year $5.90
Electricity Fees $45,827 - $ -
Natural Gas $313,139 58,054 MMBtu $5.39
TOTAL ENERGY COSTS $1,057,869
RECOMMENDED SAVINGS* $465,195 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$295,797
Cost:
$2,920
- - - - $295,797 51,753 -
-
kWh
-
-
kW-months/year
$295,797
51,753
MMBtu
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$113,009
Cost:
$24,500
- - - - $113,009 20,966 -
-
kWh
-
-
kW-months/year
$113,009
20,966
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$50,263
Cost:
$9,960
$44,900 567,200 $5,363 909 - - $44,900
567,200
kWh
$5,363
909
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,974
Cost:
$9,555
$2,974 37,670 - - - - $2,974
37,670
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,325
Cost:
$570
- - - - $1,325 246 -
-
kWh
-
-
kW-months/year
$1,325
246
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$522
Cost:
$630
$474 5,992 $48 8 - - $474
5,992
kWh
$48
8
kW-months/year
-
-
MMBtu
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$603
Cost:
$290
$603 7,618 - - - - $603
7,618
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$664
Cost:
$646
$593 7,466 $71 12 - - $593
7,466
kWh
$71
12
kW-months/year
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$38
Cost:
$19
$38 477 - - - - $38
477
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$465,195
Cost:
$49,090
$49,582 626,423 $5,482 929 $410,131 72,965 $49,582
626,423
kWh
$5,482
929
kW-months/year
$410,131
72,965
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas