IAC logo
IAC Assessment: LL0347
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0347
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2011
Principal Product Sand and Gravel
NAICS 212322 - Industrial Sand Mining
SIC 1446 - Industrial Sand
Sales $5,000,000-$10,000,000
# of Employees 17
Plant Area (Sq.Ft.) 4,800,000
Annual Production 1,100,000 Tons
Production Hrs. Annual 8,112
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $434,510 8,899,800 kWh $0.05
Electricity Demand $170,089 24,298 kW-months/year $7.00
TOTAL ENERGY COSTS $604,599
RECOMMENDED SAVINGS* $60,825 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$53,145
Cost:
$166,176
$53,145 1,088,593 - - - - - - $53,145
1,088,593
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$3,308
Cost:
$330
$1,808 37,033 - - - - $1,500 - $1,808
37,033
kWh
-
-
kW-months/year
-
-
$
$1,500
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,835
Cost:
$30
$1,835 37,580 - - - - - - $1,835
37,580
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,754
Cost:
$180
$1,754 35,942 - - - - - - $1,754
35,942
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$352
Cost:
$30
$352 7,212 - - - - - - $352
7,212
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$223
Cost:
$525
$223 4,570 - - - - - - $223
4,570
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$99
Cost:
$70
$32 664 $6 1 $61 - - - $32
664
kWh
$6
1
kW-months/year
$61
-
$
-
-
$
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$85
Cost:
$184
$85 1,747 - - - - - - $85
1,747
kWh
-
-
kW-months/year
-
-
$
-
-
$
09: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$24
Cost:
$66
$24 487 - - - - - - $24
487
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$60,825
Cost:
$167,591
$59,258 1,213,828 $6 1 $61 - $1,500 - $59,258
1,213,828
kWh
$6
1
kW-months/year
$61
-
$
$1,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost