IAC Assessment: LL0349
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0349
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2011
Principal Product Beer and root beer
NAICS 312111 - Soft Drink Manufacturing
SIC 2082 - Malt Beverages
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 30,000
Annual Production 110,000 BBL
Production Hrs. Annual 8,736
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $168,669 2,540,600 kWh $0.07
Electricity Demand $73,750 7,375 kW-months/year $10.00
Natural Gas $98,951 18,569 MMBtu $5.33
TOTAL ENERGY COSTS $341,370
RECOMMENDED SAVINGS* $21,877 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,074
#|Description Savings
Cost
Status Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,074
Cost:
$4,720
$16,074 242,117 - - - - $16,074
242,117
kWh
-
-
MMBtu
-
-
$
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,614
Cost:
$150
$1,114 16,773 - - $1,500 - $1,114
16,773
kWh
-
-
MMBtu
$1,500
-
$
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,752
Cost:
$384
- - - - $1,752 - -
-
kWh
-
-
MMBtu
$1,752
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,238
Cost:
$2,563
- - $1,238 232 - - -
-
kWh
$1,238
232
MMBtu
-
-
$
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$116
Cost:
$195
$116 1,747 - - - - $116
1,747
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$83
Cost:
$51
$83 1,250 - - - - $83
1,250
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$21,877
Cost:
$8,063
$17,387 261,887 $1,238 232 $3,252 - $17,387
261,887
kWh
$1,238
232
MMBtu
$3,252
-
$
TOTAL IMPLEMENTED Savings:
$16,074
Cost:
$4,720
$16,074 242,117 - - - - $16,074
242,117
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost