IAC Assessment: LL0350
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0350
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2011
Principal Product sand and gravel
NAICS 212322 - Industrial Sand Mining
SIC 1446 - Industrial Sand
Sales $5,000,000-$10,000,000
# of Employees 16
Plant Area (Sq.Ft.) 9,000
Annual Production 1,200,000 Tons
Production Hrs. Annual 5,000
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $325,430 5,076,674 kWh $0.06
Electricity Demand $181,797 19,795 kW-months/year $9.18
TOTAL ENERGY COSTS $507,227
RECOMMENDED SAVINGS* $91,060 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,579
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$87,490
Cost:
$144,239
$87,490 1,364,900 - - - - - - $87,490
1,364,900
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,558
Cost:
$150
$58 902 - - $1,500 - - - $58
902
kWh
-
-
kW-months/year
$1,500
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,021
Cost:
$270
$1,021 15,930 - - - - - - $1,021
15,930
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$390
Cost:
$1,995
$390 6,088 - - - - - - $390
6,088
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$268
Cost:
$375
$224 3,494 $44 5 - - - - $224
3,494
kWh
$44
5
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$223
Cost:
$140
$85 1,328 $17 2 $73 - $49 - $85
1,328
kWh
$17
2
kW-months/year
$73
-
$
$49
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$110
Cost:
$300
$110 1,714 - - - - - - $110
1,714
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$91,060
Cost:
$147,469
$89,378 1,394,356 $61 7 $1,573 - $49 - $89,378
1,394,356
kWh
$61
7
kW-months/year
$1,573
-
$
$49
-
$
TOTAL IMPLEMENTED Savings:
$2,579
Cost:
$420
$1,079 16,832 - - $1,500 - - - $1,079
16,832
kWh
-
-
kW-months/year
$1,500
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost