IAC logo
IAC Assessment: LL0364
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0364
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2012
Principal Product Refinished Aircraft
NAICS 488190 - Other Support Activities for Air Transportation
SIC 4581 - Airports, Flying Fields, & Services
Sales $5,000,000-$10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 160,000
Annual Production 100 Pieces
Production Hrs. Annual 8,736
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $219,713 3,299,108 kWh $0.07
Electricity Demand $111,860 9,974 kW-months/year $11.22
Natural Gas $193,931 20,046 MMBtu $9.67
TOTAL ENERGY COSTS $525,503
RECOMMENDED SAVINGS* $45,531 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,858
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20,983
Cost:
$2,990
$20,983 315,055 - - - - - - - - $20,983
315,055
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,159
Cost:
$30
$10,159 152,531 - - - - - - - - $10,159
152,531
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$3,717
Cost:
$600
$2,217 33,284 - - - - - - $1,500 - $2,217
33,284
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,500
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,597
Cost:
$360
$2,597 39,000 - - - - - - - - $2,597
39,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,380
Cost:
$840
$531 7,967 $122 11 - - - - $727 - $531
7,967
kWh
$122
11
kW-months/year
-
-
MMBtu
-
-
$
$727
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,059
Cost:
$3,150
$860 12,908 $199 18 - - - - - - $860
12,908
kWh
$199
18
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$815
Cost:
$1,286
$815 12,230 - - - - - - - - $815
12,230
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$208
Cost:
$600
$208 3,122 - - - - - - - - $208
3,122
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$178
Cost:
$165
- - - - $178 18 - - - - -
-
kWh
-
-
kW-months/year
$178
18
MMBtu
-
-
$
-
-
$
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$72
Cost:
$30
$41 610 $32 3 - - - - - - $41
610
kWh
$32
3
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$4,365
Cost:
$2,490
- - - - - - $4,365 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,365
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$45,531
Cost:
$12,541
$38,409 576,707 $353 31 $178 18 $4,365 - $2,227 - $38,409
576,707
kWh
$353
31
kW-months/year
$178
18
MMBtu
$4,365
-
$
$2,227
-
$
TOTAL IMPLEMENTED Savings:
$34,858
Cost:
$3,620
$33,358 500,870 - - - - - - $1,500 - $33,358
500,870
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes