IAC logo
IAC Assessment: LM0001
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0001
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product sewer cleaning equipment
NAICS n/a
SIC 3589 - Service Industry Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 24,000
Annual Production 15,000 Pieces
Production Hrs. Annual 2,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $12,342 126,792 kWh $0.10
Electricity Demand $2,167 800 kW-months/year $2.71
Electricity Fees $2,030 - $ -
TOTAL ENERGY COSTS $19,539
RECOMMENDED SAVINGS* $159,673 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,934
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Increase in Production
$ kWh $ kW-months/year $ gal $ $ $ $ $ %
01: 2.8112 COMBINE UTILITY METERS Savings:
$3,197
Cost:
$7,500
- - - - - - - - $3,197 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$3,197
-
$
-
-
%
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,249
Cost:
$2,745
$1,062 10,616 $187 60 - - - - - - - - $1,062
10,616
kWh
$187
60
kW-months/year
-
-
gal
-
-
$
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$934
Cost:
$130
$1,100 11,001 $194 64 - - $(-360) - - - - - $1,100
11,001
kWh
$194
64
kW-months/year
-
-
gal
$(-360)
-
$
-
-
$
-
-
%
04: 3.3121 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS Savings:
$2,293
Cost:
$40
- - - - $2,293 - - - - - - - -
-
kWh
-
-
kW-months/year
$2,293
-
gal
-
-
$
-
-
$
-
-
%
05: 4.5210 CLEAR AND RENT EXISTING SPACE Savings:
$121,000
Cost:
$12,000
- - - - - - - - $121,000 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$121,000
-
$
-
-
%
06: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$18,500
Cost:
$600
- - - - - - $(-2,400) - - - $20,900 - -
-
kWh
-
-
kW-months/year
-
-
gal
$(-2,400)
-
$
-
-
$
$20,900
-
%
07: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$12,500
Cost:
-
- - - - - - - - $12,500 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$12,500
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$159,673
Cost:
$23,015
$2,162 21,617 $381 124 $2,293 - $(-2,760) - $136,697 - $20,900 - $2,162
21,617
kWh
$381
124
kW-months/year
$2,293
-
gal
$(-2,760)
-
$
$136,697
-
$
$20,900
-
%
TOTAL IMPLEMENTED Savings:
$31,934
Cost:
$730
$1,100 11,001 $194 64 - - $(-2,760) - $12,500 - $20,900 - $1,100
11,001
kWh
$194
64
kW-months/year
-
-
gal
$(-2,760)
-
$
$12,500
-
$
$20,900
-
%
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $ $ %
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Administrative Changes Increase in Production