IAC logo
IAC Assessment: LM0002
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0002
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product magnets
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 45,000
Annual Production 15,000 Pieces
Production Hrs. Annual 2,808
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,129 613,400 kWh $0.12
Electricity Demand $13,332 2,472 kW-months/year $5.39
Electricity Fees $16,159 - $ -
Natural Gas $5,385 731 MMBtu $7.37
TOTAL ENERGY COSTS $120,455
RECOMMENDED SAVINGS* $243,094 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $130,261
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Increase in Production
$ kWh $ kW-months/year $ lb $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,192
Cost:
$3,285
$3,882 47,673 $1,310 131 - - - - - - $3,882
47,673
kWh
$1,310
131
kW-months/year
-
-
lb
-
-
$
-
-
%
02: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$1,259
Cost:
$3,158
$821 9,950 $438 45 - - - - - - $821
9,950
kWh
$438
45
kW-months/year
-
-
lb
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,253
Cost:
$250
$830 10,056 $423 43 - - - - - - $830
10,056
kWh
$423
43
kW-months/year
-
-
lb
-
-
$
-
-
%
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$508
Cost:
-
$253 3,068 $255 26 - - - - - - $253
3,068
kWh
$255
26
kW-months/year
-
-
lb
-
-
$
-
-
%
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,282
Cost:
$12,475
- - - - $6,282 - - - - - -
-
kWh
-
-
kW-months/year
$6,282
-
lb
-
-
$
-
-
%
06: 3.7197 USE ULTRASONIC CLEANING Savings:
$100,100
Cost:
$90,000
- - - - - - $100,100 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$100,100
-
$
-
-
%
07: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$128,500
Cost:
-
- - - - - - $(-87,500) - $216,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$(-87,500)
-
$
$216,000
-
%
TOTAL RECOMMENDED Savings:
$243,094
Cost:
$109,168
$5,786 70,747 $2,426 245 $6,282 - $12,600 - $216,000 - $5,786
70,747
kWh
$2,426
245
kW-months/year
$6,282
-
lb
$12,600
-
$
$216,000
-
%
TOTAL IMPLEMENTED Savings:
$130,261
Cost:
$250
$1,083 13,124 $678 69 - - $(-87,500) - $216,000 - $1,083
13,124
kWh
$678
69
kW-months/year
-
-
lb
$(-87,500)
-
$
$216,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ %
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Increase in Production