IAC Assessment: LM0007
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0007
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product axles
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 35,000
Annual Production 16,500 Pieces
Production Hrs. Annual 4,680
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $114,074 1,294,080 kWh $0.09
Electricity Demand $37,062 4,688 kW-months/year $7.91
Electricity Fees $2,430 - $ -
Natural Gas $112,417 17,848 MMBtu $6.30
TOTAL ENERGY COSTS $265,983
RECOMMENDED SAVINGS* $102,902 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,052
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,501
Cost:
$630
$16,141 123,210 $2,140 316 - - $(-780) - - - $16,141
123,210
kWh
$2,140
316
kW-months/year
-
-
MMBtu
$(-780)
-
$
-
-
$
02: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$2,859
Cost:
$500
- - - - $2,859 445 - - - - -
-
kWh
-
-
kW-months/year
$2,859
445
MMBtu
-
-
$
-
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$1,567
Cost:
$3,000
$529 7,621 $1,038 88 - - - - - - $529
7,621
kWh
$1,038
88
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,741
Cost:
$12,000
- - $4,741 397 - - - - - - -
-
kWh
$4,741
397
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$26,071
Cost:
$150
- - - - - - - - $26,071 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$26,071
-
$
06: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$20,250
Cost:
$416
$18,016 163,950 $2,234 358 - - - - - - $18,016
163,950
kWh
$2,234
358
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$29,913
Cost:
$29,612
- - - - - - $29,913 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$29,913
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$102,902
Cost:
$46,308
$34,686 294,781 $10,153 1,159 $2,859 445 $29,133 - $26,071 - $34,686
294,781
kWh
$10,153
1,159
kW-months/year
$2,859
445
MMBtu
$29,133
-
$
$26,071
-
$
TOTAL IMPLEMENTED Savings:
$75,052
Cost:
$33,392
$16,670 130,831 $3,178 404 - - $29,133 - $26,071 - $16,670
130,831
kWh
$3,178
404
kW-months/year
-
-
MMBtu
$29,133
-
$
$26,071
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes