IAC logo
IAC Assessment: LM0010
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0010
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product opto-electronic components
NAICS n/a
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 42,000
Annual Production 250,000 Pieces
Production Hrs. Annual 2,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $292,930 4,812,533 kWh $0.06
Electricity Demand $120,994 10,405 kW-months/year $11.63
Electricity Fees $37,930 - $ -
Natural Gas $5,061 463 MMBtu $10.93
TOTAL ENERGY COSTS $456,915
RECOMMENDED SAVINGS* $475,942 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,110
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.7145 INSTALL SKYLIGHTS Savings:
$650
Cost:
$1,600
$445 3,144 $205 20 - - - - $445
3,144
kWh
$205
20
kW-months/year
-
-
$
-
-
$
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$3,603
Cost:
$5,085
$2,691 20,877 $912 102 - - - - $2,691
20,877
kWh
$912
102
kW-months/year
-
-
$
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$35,295
Cost:
$60,000
$16,385 121,550 $18,910 2,020 - - - - $16,385
121,550
kWh
$18,910
2,020
kW-months/year
-
-
$
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,507
Cost:
-
$4,627 35,490 $1,065 83 $(-3,185) - - - $4,627
35,490
kWh
$1,065
83
kW-months/year
$(-3,185)
-
$
-
-
$
05: 2.8112 COMBINE UTILITY METERS Savings:
$100,007
Cost:
$60,200
- - - - - - $100,007 - -
-
kWh
-
-
kW-months/year
-
-
$
$100,007
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$21,880
Cost:
$11,800
- - - - - - $21,880 - -
-
kWh
-
-
kW-months/year
-
-
$
$21,880
-
$
07: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$312,000
Cost:
$100,000
- - - - $312,000 - - - -
-
kWh
-
-
kW-months/year
$312,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$475,942
Cost:
$238,685
$24,148 181,061 $21,092 2,225 $308,815 - $121,887 - $24,148
181,061
kWh
$21,092
2,225
kW-months/year
$308,815
-
$
$121,887
-
$
TOTAL IMPLEMENTED Savings:
$6,110
Cost:
$5,085
$7,318 56,367 $1,977 185 $(-3,185) - - - $7,318
56,367
kWh
$1,977
185
kW-months/year
$(-3,185)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes