IAC logo
IAC Assessment: LM0011
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0011
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product tubes
NAICS n/a
SIC 3400 -
Sales $50,000,000-$100,000,000
# of Employees 75
Plant Area (Sq.Ft.) 265,800
Annual Production 120,000 Tons
Production Hrs. Annual 2,522
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $345,082 6,032,618 kWh $0.06
Electricity Demand $439,046 132,900 kW-months/year $3.30
Electricity Fees $29,009 - $ -
Natural Gas $1,898 169 MMBtu $11.23
TOTAL ENERGY COSTS $815,035
RECOMMENDED SAVINGS* $414,318 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $407,997
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Primary Product Increase in Production Electricity Usage Electricity Demand Electricity Fees Personnel Changes Primary Product Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,705
Cost:
$250
$3,209 28,278 $1,276 134 - - $(-780) - - - - - $3,209
28,278
kWh
$1,276
134
kW-months/year
-
-
$
$(-780)
-
$
-
-
$
-
-
%
02: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$804
Cost:
$855
$573 5,023 $231 24 - - - - - - - - $573
5,023
kWh
$231
24
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$94,292
Cost:
$450
- - $31,422 - $43,983 - $(-57,200) - $76,087 - - - -
-
kWh
$31,422
-
kW-months/year
$43,983
-
$
$(-57,200)
-
$
$76,087
-
$
-
-
%
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$5,517
Cost:
$12,000
$3,963 28,600 $1,554 206 - - - - - - - - $3,963
28,600
kWh
$1,554
206
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
05: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$310,000
Cost:
$1,000
- - - - - - $(-40,000) - - - $350,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$(-40,000)
-
$
-
-
$
$350,000
-
%
TOTAL RECOMMENDED Savings:
$414,318
Cost:
$14,555
$7,745 61,901 $34,483 364 $43,983 - $(-97,980) - $76,087 - $350,000 - $7,745
61,901
kWh
$34,483
364
kW-months/year
$43,983
-
$
$(-97,980)
-
$
$76,087
-
$
$350,000
-
%
TOTAL IMPLEMENTED Savings:
$407,997
Cost:
$1,700
$3,209 28,278 $32,698 134 $43,983 - $(-97,980) - $76,087 - $350,000 - $3,209
28,278
kWh
$32,698
134
kW-months/year
$43,983
-
$
$(-97,980)
-
$
$76,087
-
$
$350,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Primary Product Increase in Production Electricity Usage Electricity Demand Electricity Fees Personnel Changes Primary Product Increase in Production