IAC logo
IAC Assessment: LM0017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product aerospace metal ducts
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 370
Plant Area (Sq.Ft.) 125,000
Annual Production 163,285 Pieces
Production Hrs. Annual 5,246
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,926 2,395,744 kWh $0.05
Electricity Demand $89,195 17,046 kW-months/year $5.23
Electricity Fees $97,955 - $ -
TOTAL ENERGY COSTS $309,076
RECOMMENDED SAVINGS* $1,386,362 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,000,982
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Product Increase in Production Electricity Usage Electricity Demand Personnel Changes Primary Product Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,365
Cost:
$300
$2,620 23,169 $525 53 $(-780) - - - - - $2,620
23,169
kWh
$525
53
kW-months/year
$(-780)
-
$
-
-
$
-
-
%
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,880
Cost:
$164
$2,398 21,184 $482 48 - - - - - - $2,398
21,184
kWh
$482
48
kW-months/year
-
-
$
-
-
$
-
-
%
03: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$48,865
Cost:
$450
$23,218 205,000 $52,647 5,250 $(-27,000) - - - - - $23,218
205,000
kWh
$52,647
5,250
kW-months/year
$(-27,000)
-
$
-
-
$
-
-
%
04: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$409,752
Cost:
$26,000
- - - - - - $409,752 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$409,752
-
$
-
-
%
05: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$540,000
Cost:
$11,000
- - - - - - - - $540,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$540,000
-
%
06: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$382,500
Cost:
$6,000
- - - - $382,500 - - - - - -
-
kWh
-
-
kW-months/year
$382,500
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$1,386,362
Cost:
$43,914
$28,236 249,353 $53,654 5,351 $354,720 - $409,752 - $540,000 - $28,236
249,353
kWh
$53,654
5,351
kW-months/year
$354,720
-
$
$409,752
-
$
$540,000
-
%
TOTAL IMPLEMENTED Savings:
$1,000,982
Cost:
$37,750
$25,838 228,169 $53,172 5,303 $(-27,780) - $409,752 - $540,000 - $25,838
228,169
kWh
$53,172
5,303
kW-months/year
$(-27,780)
-
$
$409,752
-
$
$540,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Primary Product Increase in Production Electricity Usage Electricity Demand Personnel Changes Primary Product Increase in Production