IAC logo
IAC Assessment: LM0020
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0020
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product thermal processing
NAICS n/a
SIC 3398 - Metal Heat Treating
Sales $10,000,000-$50,000,000
# of Employees 92
Plant Area (Sq.Ft.) 50,000
Annual Production 32,500,000 Pounds
Production Hrs. Annual 3,744
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $218,006 3,824,586 kWh $0.06
Electricity Demand $73,486 8,892 kW-months/year $8.26
Electricity Fees $135,848 - $ -
Natural Gas $160,969 26,224 MMBtu $6.14
TOTAL ENERGY COSTS $588,309
RECOMMENDED SAVINGS* $305,570 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $205,399
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,625
Cost:
$869
$1,387 20,043 $238 28 - - - - - - $1,387
20,043
kWh
$238
28
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,709
Cost:
-
$2,275 32,886 $434 50 - - - - - - $2,275
32,886
kWh
$434
50
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$81,101
Cost:
$150,000
- - - - $81,101 13,677 - - - - -
-
kWh
-
-
kW-months/year
$81,101
13,677
MMBtu
-
-
$
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,792
Cost:
$11,800
- - - - - - - - $4,792 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,792
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,575
Cost:
$300
- - - - - - - - $1,575 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,575
-
$
06: 4.4260 MODIFY WORKLOAD Savings:
$201,115
Cost:
$1,000
- - - - - - $201,115 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$201,115
-
$
-
-
$
07: 4.4260 MODIFY WORKLOAD Savings:
$12,653
Cost:
$1,199
- - - - - - $12,653 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,653
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$305,570
Cost:
$165,168
$3,662 52,929 $672 78 $81,101 13,677 $213,768 - $6,367 - $3,662
52,929
kWh
$672
78
kW-months/year
$81,101
13,677
MMBtu
$213,768
-
$
$6,367
-
$
TOTAL IMPLEMENTED Savings:
$205,399
Cost:
$1,300
$2,275 32,886 $434 50 - - $201,115 - $1,575 - $2,275
32,886
kWh
$434
50
kW-months/year
-
-
MMBtu
$201,115
-
$
$1,575
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes