IAC logo
IAC Assessment: LM0024
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0024
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2002
Principal Product centrifugal castings
NAICS n/a
SIC 3369 - Nonferrous Foundries, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 40,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 4,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $425,107 35,082,369 kWh $0.01
Electricity Demand $188,080 38,481 kW-months/year $4.89
Electricity Fees $10,339 - $ -
Natural Gas $53,378 7,002 MMBtu $7.62
TOTAL ENERGY COSTS $676,904
RECOMMENDED SAVINGS* $590,871 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $373,919
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$7,010
Cost:
$2,500
$5,757 59,352 $1,253 172 - - - - - - - - $5,757
59,352
kWh
$1,253
172
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$8,154
Cost:
$3,000
$6,396 65,942 $1,758 120 - - - - - - - - $6,396
65,942
kWh
$1,758
120
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$11,155
Cost:
-
$8,943 72,468 $2,212 229 - - - - - - - - $8,943
72,468
kWh
$2,212
229
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$3,312
Cost:
$1,600
- - - - $3,312 700 - - - - - - -
-
kWh
-
-
kW-months/year
$3,312
700
MMBtu
-
-
$
-
-
$
-
-
$
05: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$110,000
Cost:
$4,500
- - - - - - - - $110,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$110,000
-
$
-
-
$
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$237,600
Cost:
-
- - - - - - - - - - $237,600 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$237,600
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$166,320
Cost:
$100,000
- - - - - - - - $166,320 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$166,320
-
$
-
-
$
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$47,320
Cost:
-
- - - - - - $47,320 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$47,320
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$590,871
Cost:
$111,600
$21,096 197,762 $5,223 521 $3,312 700 $47,320 - $276,320 - $237,600 - $21,096
197,762
kWh
$5,223
521
kW-months/year
$3,312
700
MMBtu
$47,320
-
$
$276,320
-
$
$237,600
-
$
TOTAL IMPLEMENTED Savings:
$373,919
Cost:
$10,000
$21,096 197,762 $5,223 521 - - - - $110,000 - $237,600 - $21,096
197,762
kWh
$5,223
521
kW-months/year
-
-
MMBtu
-
-
$
$110,000
-
$
$237,600
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Product