IAC Assessment: LM0040
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0040
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2002
Principal Product iron pipe fittings
NAICS n/a
SIC 3498 - Fabricated Pipe And Fittings
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 90,440
Annual Production 5,428,665 Pounds
Production Hrs. Annual 4,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,878 2,055,357 kWh $0.08
Electricity Demand $69,859 8,748 kW-months/year $7.99
Electricity Fees $25,327 - $ -
Natural Gas $45,689 8,557 MMBtu $5.34
TOTAL ENERGY COSTS $311,753
RECOMMENDED SAVINGS* $180,007 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,476
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,685
Cost:
$450
$2,855 27,000 $610 78 - - $(-780) - - - - - $2,855
27,000
kWh
$610
78
kW-months/year
-
-
MMBtu
$(-780)
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,048
Cost:
$600
$1,484 14,040 $564 72 - - - - - - - - $1,484
14,040
kWh
$564
72
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,476
Cost:
$288
$1,240 11,737 $236 30 - - - - - - - - $1,240
11,737
kWh
$236
30
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,360
Cost:
$1,440
$1,586 15,004 $774 98 - - - - - - - - $1,586
15,004
kWh
$774
98
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,888
Cost:
$9,000
- - - - $4,888 1,459 - - - - - - -
-
kWh
-
-
kW-months/year
$4,888
1,459
MMBtu
-
-
$
-
-
$
-
-
$
06: 4.121 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING Savings:
$108,300
Cost:
$200
- - - - - - - - $108,300 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$108,300
-
$
-
-
$
07: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$45,250
Cost:
$1,332
- - - - - - - - - - $45,250 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$45,250
-
$
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$13,000
Cost:
$3,900
- - - - - - $13,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$13,000
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$180,007
Cost:
$17,210
$7,165 67,781 $2,184 278 $4,888 1,459 $12,220 - $108,300 - $45,250 - $7,165
67,781
kWh
$2,184
278
kW-months/year
$4,888
1,459
MMBtu
$12,220
-
$
$108,300
-
$
$45,250
-
$
TOTAL IMPLEMENTED Savings:
$1,476
Cost:
$288
$1,240 11,737 $236 30 - - - - - - - - $1,240
11,737
kWh
$236
30
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost