IAC Assessment: LM0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2002
Principal Product corrugated packaging
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 200,000
Annual Production 1,200 Thousand Feet
Production Hrs. Annual 5,976
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $410,612 4,501,264 kWh $0.09
Electricity Demand $130,655 11,580 kW-months/year $11.28
Electricity Fees $(-24,308) - $ -
TOTAL ENERGY COSTS $516,959
RECOMMENDED SAVINGS* $1,064,829 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $324,187
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$604
Cost:
$350
$890 8,025 $214 17 $(-500) - - - - - $890
8,025
kWh
$214
17
kW-months/year
$(-500)
-
$
-
-
$
-
-
%
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,833
Cost:
$100
$1,480 13,341 $353 26 - - - - - - $1,480
13,341
kWh
$353
26
kW-months/year
-
-
$
-
-
$
-
-
%
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$6,250
Cost:
$1,000
$5,045 45,473 $1,205 91 - - - - - - $5,045
45,473
kWh
$1,205
91
kW-months/year
-
-
$
-
-
$
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$122,392
Cost:
$68,248
$102,031 885,464 $20,361 1,778 - - - - - - $102,031
885,464
kWh
$20,361
1,778
kW-months/year
-
-
$
-
-
$
-
-
%
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$612,000
Cost:
$1,100,000
- - - - - - - - $612,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$612,000
-
%
06: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$93,750
Cost:
$24,000
- - - - - - $93,750 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$93,750
-
$
-
-
%
07: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$228,000
Cost:
$1,000
- - - - - - $228,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$228,000
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$1,064,829
Cost:
$1,194,698
$109,446 952,303 $22,133 1,912 $(-500) - $321,750 - $612,000 - $109,446
952,303
kWh
$22,133
1,912
kW-months/year
$(-500)
-
$
$321,750
-
$
$612,000
-
%
TOTAL IMPLEMENTED Savings:
$324,187
Cost:
$25,450
$2,370 21,366 $567 43 $(-500) - $321,750 - - - $2,370
21,366
kWh
$567
43
kW-months/year
$(-500)
-
$
$321,750
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Increase in Production