Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Loyola Marymount University |
---|---|
Assessment Year | 2003 |
Principal Product | Brass/Bronze Castings |
NAICS | 331529 - Other Nonferrous Metal Foundries (except Die-Casting) |
SIC | 3366 - Copper Foundries |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 80,820 |
Annual Production | 2,500 Tons |
Production Hrs. Annual | 2,080 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $479,082 | 5,210,800 | kWh | $0.09 |
Electricity Fees | $166,404 | - | $ | - |
Natural Gas | $31,967 | 5,303 | MMBtu | $6.03 |
TOTAL ENERGY COSTS | $677,453 | |||
RECOMMENDED SAVINGS* | $806,615 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,300 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Increase in Production | Electricity Usage | Natural Gas | Administrative Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,587 Cost: $690 |
$3,587 | 29,874 | - | - | - | - | - | - |
$3,587 29,874 kWh |
- - MMBtu |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $7,713 Cost: - |
$7,713 | 55,198 | - | - | - | - | - | - |
$7,713 55,198 kWh |
- - MMBtu |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,371 Cost: $1,200 |
$1,555 | 12,650 | $(-184) | (-31) | - | - | - | - |
$1,555 12,650 kWh |
$(-184) (-31) MMBtu |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $300,000 Cost: $5,000 |
- | - | - | - | - | - | $300,000 | - |
- - kWh |
- - MMBtu |
- - $ |
$300,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $450,000 Cost: $20,000 |
- | - | - | - | - | - | $450,000 | - |
- - kWh |
- - MMBtu |
- - $ |
$450,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,754 Cost: $1,968 |
$1,754 | 14,262 | - | - | - | - | - | - |
$1,754 14,262 kWh |
- - MMBtu |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,330 Cost: $6,675 |
$3,330 | 27,228 | - | - | - | - | - | - |
$3,330 27,228 kWh |
- - MMBtu |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $35,000 Cost: $28,714 |
- | - | - | - | $35,000 | - | - | - |
- - kWh |
- - MMBtu |
$35,000 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,504 Cost: $1,726 |
- | - | $3,504 | 582 | - | - | - | - |
- - kWh |
$3,504 582 MMBtu |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE |
Savings: $356 Cost: - |
- | - | $356 | 56 | - | - | - | - |
- - kWh |
$356 56 MMBtu |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $806,615 Cost: $65,973 |
$17,939 | 139,212 | $3,676 | 607 | $35,000 | - | $750,000 | - | $17,939 139,212 kWh |
$3,676 607 MMBtu |
$35,000 - $ |
$750,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,300 Cost: $690 |
$11,300 | 85,072 | - | - | - | - | - | - | $11,300 85,072 kWh |
- - MMBtu |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Increase in Production | Electricity Usage | Natural Gas | Administrative Changes | Increase in Production |