IAC Assessment: LM0056
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0056
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2003
Principal Product Brass/Bronze Castings
NAICS 331529 - Other Nonferrous Metal Foundries (except Die-Casting)
SIC 3366 - Copper Foundries
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 80,820
Annual Production 2,500 Tons
Production Hrs. Annual 2,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $479,082 5,210,800 kWh $0.09
Electricity Fees $166,404 - $ -
Natural Gas $31,967 5,303 MMBtu $6.03
TOTAL ENERGY COSTS $677,453
RECOMMENDED SAVINGS* $806,615 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,300
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Increase in Production Electricity Usage Natural Gas Administrative Changes Increase in Production
$ kWh $ MMBtu $ $ $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,587
Cost:
$690
$3,587 29,874 - - - - - - $3,587
29,874
kWh
-
-
MMBtu
-
-
$
-
-
%
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$7,713
Cost:
-
$7,713 55,198 - - - - - - $7,713
55,198
kWh
-
-
MMBtu
-
-
$
-
-
%
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,371
Cost:
$1,200
$1,555 12,650 $(-184) (-31) - - - - $1,555
12,650
kWh
$(-184)
(-31)
MMBtu
-
-
$
-
-
%
04: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$300,000
Cost:
$5,000
- - - - - - $300,000 - -
-
kWh
-
-
MMBtu
-
-
$
$300,000
-
%
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$450,000
Cost:
$20,000
- - - - - - $450,000 - -
-
kWh
-
-
MMBtu
-
-
$
$450,000
-
%
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,754
Cost:
$1,968
$1,754 14,262 - - - - - - $1,754
14,262
kWh
-
-
MMBtu
-
-
$
-
-
%
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,330
Cost:
$6,675
$3,330 27,228 - - - - - - $3,330
27,228
kWh
-
-
MMBtu
-
-
$
-
-
%
08: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$35,000
Cost:
$28,714
- - - - $35,000 - - - -
-
kWh
-
-
MMBtu
$35,000
-
$
-
-
%
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,504
Cost:
$1,726
- - $3,504 582 - - - - -
-
kWh
$3,504
582
MMBtu
-
-
$
-
-
%
10: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$356
Cost:
-
- - $356 56 - - - - -
-
kWh
$356
56
MMBtu
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$806,615
Cost:
$65,973
$17,939 139,212 $3,676 607 $35,000 - $750,000 - $17,939
139,212
kWh
$3,676
607
MMBtu
$35,000
-
$
$750,000
-
%
TOTAL IMPLEMENTED Savings:
$11,300
Cost:
$690
$11,300 85,072 - - - - - - $11,300
85,072
kWh
-
-
MMBtu
-
-
$
-
-
%
Savings
Cost
$ kWh $ MMBtu $ $ $ %
Electricity Usage Natural Gas Administrative Changes Increase in Production Electricity Usage Natural Gas Administrative Changes Increase in Production