IAC logo
IAC Assessment: LM0057
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0057
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2003
Principal Product four color large format printing
NAICS 313210 - Broadwoven Fabric Mills
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 51
Plant Area (Sq.Ft.) 33,000
Annual Production 3,021,000 Pounds
Production Hrs. Annual 4,576
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,633 1,089,324 kWh $0.05
Electricity Demand $55,378 10,680 kW-months/year $5.19
Electricity Fees $2,769 - $ -
TOTAL ENERGY COSTS $114,780
RECOMMENDED SAVINGS* $191,369 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $191,369
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Increase in Production
$ kWh $ kW-months/year $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$543
Cost:
$1,430
$482 8,829 $61 26 - - - - $482
8,829
kWh
$61
26
kW-months/year
-
-
$
-
-
%
02: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$2,375
Cost:
$3,580
$1,881 36,260 $494 95 - - - - $1,881
36,260
kWh
$494
95
kW-months/year
-
-
$
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$568
Cost:
$140
$450 8,694 $118 23 - - - - $450
8,694
kWh
$118
23
kW-months/year
-
-
$
-
-
%
04: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$140,025
Cost:
$42,126
- - - - $140,025 - - - -
-
kWh
-
-
kW-months/year
$140,025
-
$
-
-
%
05: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$47,858
Cost:
$12,520
- - - - - - $47,858 - -
-
kWh
-
-
kW-months/year
-
-
$
$47,858
-
%
TOTAL RECOMMENDED Savings:
$191,369
Cost:
$59,796
$2,813 53,783 $673 144 $140,025 - $47,858 - $2,813
53,783
kWh
$673
144
kW-months/year
$140,025
-
$
$47,858
-
%
TOTAL IMPLEMENTED Savings:
$191,369
Cost:
$59,796
$2,813 53,783 $673 144 $140,025 - $47,858 - $2,813
53,783
kWh
$673
144
kW-months/year
$140,025
-
$
$47,858
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Increase in Production