Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Loyola Marymount University |
---|---|
Assessment Year | 2003 |
Principal Product | four color large format printing |
NAICS | 313210 - Broadwoven Fabric Mills |
SIC | 2752 - Commercial Printing, Lithographic |
Sales | $5,000,000-$10,000,000 |
# of Employees | 51 |
Plant Area (Sq.Ft.) | 33,000 |
Annual Production | 3,021,000 Pounds |
Production Hrs. Annual | 4,576 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $56,633 | 1,089,324 | kWh | $0.05 |
Electricity Demand | $55,378 | 10,680 | kW-months/year | $5.19 |
Electricity Fees | $2,769 | - | $ | - |
TOTAL ENERGY COSTS | $114,780 | |||
RECOMMENDED SAVINGS* | $191,369 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $191,369 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Increase in Production | Electricity Usage | Electricity Demand | Personnel Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $543 Cost: $1,430 |
$482 | 8,829 | $61 | 26 | - | - | - | - |
$482 8,829 kWh |
$61 26 kW-months/year |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7131 ADD AREA LIGHTING SWITCHES |
Savings: $2,375 Cost: $3,580 |
$1,881 | 36,260 | $494 | 95 | - | - | - | - |
$1,881 36,260 kWh |
$494 95 kW-months/year |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $568 Cost: $140 |
$450 | 8,694 | $118 | 23 | - | - | - | - |
$450 8,694 kWh |
$118 23 kW-months/year |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $140,025 Cost: $42,126 |
- | - | - | - | $140,025 | - | - | - |
- - kWh |
- - kW-months/year |
$140,025 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $47,858 Cost: $12,520 |
- | - | - | - | - | - | $47,858 | - |
- - kWh |
- - kW-months/year |
- - $ |
$47,858 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $191,369 Cost: $59,796 |
$2,813 | 53,783 | $673 | 144 | $140,025 | - | $47,858 | - | $2,813 53,783 kWh |
$673 144 kW-months/year |
$140,025 - $ |
$47,858 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $191,369 Cost: $59,796 |
$2,813 | 53,783 | $673 | 144 | $140,025 | - | $47,858 | - | $2,813 53,783 kWh |
$673 144 kW-months/year |
$140,025 - $ |
$47,858 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Increase in Production | Electricity Usage | Electricity Demand | Personnel Changes | Increase in Production |