IAC Assessment: LM0059
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0059
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2003
Principal Product asphalt saturated kraft
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 48,000
Annual Production 15,000 Tons
Production Hrs. Annual 8,184
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,140 1,420,200 kWh $0.06
Electricity Demand $26,024 2,592 kW-months/year $10.04
Electricity Fees $3,595 - $ -
Natural Gas $48,026 10,800 MMBtu $4.45
TOTAL ENERGY COSTS $167,785
RECOMMENDED SAVINGS* $6,711,011 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,200
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$634
Cost:
$310
$361 5,508 $273 26 - - - - - - - - - - - - $361
5,508
kWh
$273
26
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$298
Cost:
$120
$242 3,682 $56 5 - - - - - - - - - - - - $242
3,682
kWh
$56
5
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$402
Cost:
$150
$326 4,977 $76 7 - - - - - - - - - - - - $326
4,977
kWh
$76
7
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$245
Cost:
$145
$199 3,046 $46 5 - - - - - - - - - - - - $199
3,046
kWh
$46
5
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,308
Cost:
$5,000
- - - - $4,308 1,069 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,308
1,069
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$8,238
Cost:
$11,000
- - - - - - $10,890 - - - $(-2,652) - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,890
-
lb
-
-
$
$(-2,652)
-
$
-
-
$
-
-
%
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$5,160,984
Cost:
$1,000,000
- - - - - - - - - - - - - - $5,160,984 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
$5,160,984
-
%
08: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$17,902
Cost:
$10,000
- - - - - - - - $17,902 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$17,902
-
$
-
-
$
-
-
$
-
-
%
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$1,518,000
Cost:
$250,000
- - - - - - - - - - - - $1,518,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$1,518,000
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$6,711,011
Cost:
$1,276,725
$1,128 17,213 $451 43 $4,308 1,069 $10,890 - $17,902 - $(-2,652) - $1,518,000 - $5,160,984 - $1,128
17,213
kWh
$451
43
kW-months/year
$4,308
1,069
MMBtu
$10,890
-
lb
$17,902
-
$
$(-2,652)
-
$
$1,518,000
-
$
$5,160,984
-
%
TOTAL IMPLEMENTED Savings:
$18,200
Cost:
$10,120
$242 3,682 $56 5 - - - - $17,902 - - - - - - - $242
3,682
kWh
$56
5
kW-months/year
-
-
MMBtu
-
-
lb
$17,902
-
$
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Increase in Production