Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Loyola Marymount University |
---|---|
Assessment Year | 2004 |
Principal Product | Carpet Padding |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 332,371 Thousand Feet |
Production Hrs. Annual | 4,160 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $430,528 | 4,183,233 | kWh | $0.10 |
Electricity Demand | $172,994 | 13,860 | kW-months/year | $12.48 |
Electricity Fees | $8,561 | - | $ | - |
Natural Gas | $117,853 | 18,376 | MMBtu | $6.41 |
TOTAL ENERGY COSTS | $729,936 | |||
RECOMMENDED SAVINGS* | $176,464 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $157,485 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $757 Cost: $175 |
$560 | 5,407 | $197 | 16 | - | - | - | - |
$560 5,407 kWh |
$197 16 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,356 Cost: $1,854 |
$1,145 | 9,161 | $211 | 26 | - | - | - | - |
$1,145 9,161 kWh |
$211 26 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $552 Cost: $779 |
$409 | 3,951 | $143 | 12 | - | - | - | - |
$409 3,951 kWh |
$143 12 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $156,419 Cost: $6,500 |
$5,411 | 52,312 | - | - | - | - | $151,008 | - |
$5,411 52,312 kWh |
- - kW-months/year |
- - MMBtu |
$151,008 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.625 DEVELOP STANDARD OPERATING PROCEDURES |
Savings: $14,640 Cost: $6,500 |
- | - | - | - | - | - | $14,640 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$14,640 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $309 Cost: $101 |
- | - | - | - | $309 | 51 | - | - |
- - kWh |
- - kW-months/year |
$309 51 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $2,431 Cost: $470 |
$1,885 | 18,231 | $546 | 43 | - | - | - | - |
$1,885 18,231 kWh |
$546 43 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $176,464 Cost: $16,379 |
$9,410 | 89,062 | $1,097 | 97 | $309 | 51 | $165,648 | - | $9,410 89,062 kWh |
$1,097 97 kW-months/year |
$309 51 MMBtu |
$165,648 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $157,485 Cost: $6,776 |
$5,971 | 57,719 | $197 | 16 | $309 | 51 | $151,008 | - | $5,971 57,719 kWh |
$197 16 kW-months/year |
$309 51 MMBtu |
$151,008 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |