IAC logo
IAC Assessment: LM0075
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0075
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2004
Principal Product Carpet Padding
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 160,000
Annual Production 332,371 Thousand Feet
Production Hrs. Annual 4,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $430,528 4,183,233 kWh $0.10
Electricity Demand $172,994 13,860 kW-months/year $12.48
Electricity Fees $8,561 - $ -
Natural Gas $117,853 18,376 MMBtu $6.41
TOTAL ENERGY COSTS $729,936
RECOMMENDED SAVINGS* $176,464 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $157,485
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$757
Cost:
$175
$560 5,407 $197 16 - - - - $560
5,407
kWh
$197
16
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,356
Cost:
$1,854
$1,145 9,161 $211 26 - - - - $1,145
9,161
kWh
$211
26
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$552
Cost:
$779
$409 3,951 $143 12 - - - - $409
3,951
kWh
$143
12
kW-months/year
-
-
MMBtu
-
-
$
04: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$156,419
Cost:
$6,500
$5,411 52,312 - - - - $151,008 - $5,411
52,312
kWh
-
-
kW-months/year
-
-
MMBtu
$151,008
-
$
05: 4.625 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$14,640
Cost:
$6,500
- - - - - - $14,640 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,640
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$309
Cost:
$101
- - - - $309 51 - - -
-
kWh
-
-
kW-months/year
$309
51
MMBtu
-
-
$
07: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$2,431
Cost:
$470
$1,885 18,231 $546 43 - - - - $1,885
18,231
kWh
$546
43
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$176,464
Cost:
$16,379
$9,410 89,062 $1,097 97 $309 51 $165,648 - $9,410
89,062
kWh
$1,097
97
kW-months/year
$309
51
MMBtu
$165,648
-
$
TOTAL IMPLEMENTED Savings:
$157,485
Cost:
$6,776
$5,971 57,719 $197 16 $309 51 $151,008 - $5,971
57,719
kWh
$197
16
kW-months/year
$309
51
MMBtu
$151,008
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes