Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Loyola Marymount University |
---|---|
Assessment Year | 2004 |
Principal Product | Al bronze brass castings |
NAICS | 331529 - Other Nonferrous Metal Foundries (except Die-Casting) |
SIC | 3366 - Copper Foundries |
Sales | $5,000,000-$10,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 20,000 |
Annual Production | 800,000 Pounds |
Production Hrs. Annual | 2,000 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $85,034 | 889,183 | kWh | $0.10 |
Electricity Demand | $69,151 | 5,988 | kW-months/year | $11.55 |
Natural Gas | $21,625 | 2,648 | MMBtu | $8.17 |
TOTAL ENERGY COSTS | $175,810 | |||
RECOMMENDED SAVINGS* | $57,524 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $24,322 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $621 Cost: $475 |
$364 | 3,460 | $257 | 20 | - | - | - | - |
$364 3,460 kWh |
$257 20 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES |
Savings: $266 Cost: $165 |
$266 | 2,525 | - | - | - | - | - | - |
$266 2,525 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $537 Cost: - |
- | - | - | - | $537 | 68 | - | - |
- - kWh |
- - kW-months/year |
$537 68 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $28,600 Cost: $20,592 |
- | - | - | - | - | - | $28,600 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$28,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $3,467 Cost: $6,000 |
- | - | - | - | - | - | $3,467 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,467 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $23,164 Cost: $300 |
$3,771 | - | $25,018 | - | - | - | $(-5,625) | - |
$3,771 - kWh |
$25,018 - kW-months/year |
- - MMBtu |
$(-5,625) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $869 Cost: - |
$510 | 4,838 | $359 | 29 | - | - | - | - |
$510 4,838 kWh |
$359 29 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $57,524 Cost: $27,532 |
$4,911 | 10,823 | $25,634 | 49 | $537 | 68 | $26,442 | - | $4,911 10,823 kWh |
$25,634 49 kW-months/year |
$537 68 MMBtu |
$26,442 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $24,322 Cost: $775 |
$4,135 | 3,460 | $25,275 | 20 | $537 | 68 | $(-5,625) | - | $4,135 3,460 kWh |
$25,275 20 kW-months/year |
$537 68 MMBtu |
$(-5,625) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |