Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2005
Principal Product corrugated boxes
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 190,000
Annual Production 9,975,000 Pounds
Production Hrs. Annual 7,344
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $201,899 5,182,739 kWh $0.04
Electricity Demand $101,494 12,108 kW-months/year $8.38
Electricity Fees $4,495 - $ -
Natural Gas $494,931 70,761 MMBtu $6.99
TOTAL ENERGY COSTS $802,819
RECOMMENDED SAVINGS* $80,227 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,412
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,130
Cost:
$500
$2,320 59,490 $810 97 - - - - - - $2,320
59,490
kWh
$810
97
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,502
Cost:
$983
- - - - $2,502 358 - - - - -
-
kWh
-
-
kW-months/year
$2,502
358
MMBtu
-
-
$
-
-
$
03: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$57,780
Cost:
$50,000
- - - - - - $45,780 - $12,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$45,780
-
$
$12,000
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,187
Cost:
$34,080
$10,659 273,726 $3,528 425 - - - - - - $10,659
273,726
kWh
$3,528
425
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$2,628
Cost:
-
$1,970 50,580 $658 79 - - - - - - $1,970
50,580
kWh
$658
79
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$80,227
Cost:
$85,563
$14,949 383,796 $4,996 601 $2,502 358 $45,780 - $12,000 - $14,949
383,796
kWh
$4,996
601
kW-months/year
$2,502
358
MMBtu
$45,780
-
$
$12,000
-
$
TOTAL IMPLEMENTED Savings:
$63,412
Cost:
$51,483
$2,320 59,490 $810 97 $2,502 358 $45,780 - $12,000 - $2,320
59,490
kWh
$810
97
kW-months/year
$2,502
358
MMBtu
$45,780
-
$
$12,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes