IAC logo
IAC Assessment: LM0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2005
Principal Product plastic parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 65
Plant Area (Sq.Ft.) 28,800
Annual Production 50,000 Pounds
Production Hrs. Annual 2,168
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,014 1,211,057 kWh $0.08
Electricity Demand $50,906 5,868 kW-months/year $8.68
Electricity Fees $4,118 - $ -
TOTAL ENERGY COSTS $150,038
RECOMMENDED SAVINGS* $280,722 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $103,962
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$48,120
Cost:
$4,921
- - - - $(-850) (-113) $48,970 - -
-
kWh
-
-
kW-months/year
$(-850)
(-113)
MMBtu
$48,970
-
$
02: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$10,000
Cost:
$6,000
- - - - - - $10,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,000
-
$
03: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$166,760
Cost:
$6,090
- - - - - - $166,760 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$166,760
-
$
04: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$53,375
Cost:
$1,500
- - - - - - $53,375 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$53,375
-
$
05: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$1,250
Cost:
-
- - - - - - $1,250 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,250
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$284
Cost:
$50
$176 2,233 $108 12 - - - - $176
2,233
kWh
$108
12
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$933
Cost:
$35,082
$575 7,302 $358 41 - - - - $575
7,302
kWh
$358
41
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$280,722
Cost:
$53,643
$751 9,535 $466 53 $(-850) (-113) $280,355 - $751
9,535
kWh
$466
53
kW-months/year
$(-850)
(-113)
MMBtu
$280,355
-
$
TOTAL IMPLEMENTED Savings:
$103,962
Cost:
$41,553
$751 9,535 $466 53 $(-850) (-113) $103,595 - $751
9,535
kWh
$466
53
kW-months/year
$(-850)
(-113)
MMBtu
$103,595
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes