IAC logo
IAC Assessment: LM0100
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0100
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2005
Principal Product potted plants
NAICS 111422 - Floriculture Production
SIC 181 -
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 1,000,000
Annual Production 6,000,000 Pieces
Production Hrs. Annual 2,650
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $144,997 2,128,640 kWh $0.07
Electricity Demand $36,593 5,846 kW-months/year $6.26
Electricity Fees $528 - $ -
TOTAL ENERGY COSTS $182,118
RECOMMENDED SAVINGS* $81,413 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$820
Cost:
$6,493
$739 10,843 $81 14 - - - - $739
10,843
kWh
$81
14
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,036
Cost:
$21,600
- - - - $11,036 1,890 - - -
-
kWh
-
-
kW-months/year
$11,036
1,890
MMBtu
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,133
Cost:
$200
$2,830 43,417 $303 55 - - - - $2,830
43,417
kWh
$303
55
kW-months/year
-
-
MMBtu
-
-
$
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$7,424
Cost:
$200,000
$7,424 113,900 - - - - - - $7,424
113,900
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$5,000
Cost:
$9,000
- - - - - - $5,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,000
-
$
06: 4.5150 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$54,000
Cost:
$332,000
- - - - - - $54,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$54,000
-
$
TOTAL RECOMMENDED Savings:
$81,413
Cost:
$569,293
$10,993 168,160 $384 69 $11,036 1,890 $59,000 - $10,993
168,160
kWh
$384
69
kW-months/year
$11,036
1,890
MMBtu
$59,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost