Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2006
Principal Product Store fixtures
NAICS 337215 - Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 151,878
Annual Production 1,000 Pieces
Production Hrs. Annual 2,008
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,894 765,561 kWh $0.09
Electricity Demand $29,862 3,384 kW-months/year $8.82
Electricity Fees $11,593 - $ -
TOTAL ENERGY COSTS $113,349
RECOMMENDED SAVINGS* $60,004 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,366
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$638
Cost:
-
$421 4,189 $217 24 - - $421
4,189
kWh
$217
24
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,156
Cost:
$960
$2,082 20,041 $1,074 120 - - $2,082
20,041
kWh
$1,074
120
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,197
Cost:
$250
$2,694 28,196 $1,503 168 - - $2,694
28,196
kWh
$1,503
168
kW-months/year
-
-
$
04: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$48,035
Cost:
$1,500
$345 3,427 - - $47,690 - $345
3,427
kWh
-
-
kW-months/year
$47,690
-
$
05: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$3,978
Cost:
$1,000
$218 2,173 - - $3,760 - $218
2,173
kWh
-
-
kW-months/year
$3,760
-
$
TOTAL RECOMMENDED Savings:
$60,004
Cost:
$3,710
$5,760 58,026 $2,794 312 $51,450 - $5,760
58,026
kWh
$2,794
312
kW-months/year
$51,450
-
$
TOTAL IMPLEMENTED Savings:
$59,366
Cost:
$3,710
$5,339 53,837 $2,577 288 $51,450 - $5,339
53,837
kWh
$2,577
288
kW-months/year
$51,450
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes