IAC logo
IAC Assessment: LM0107
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0107
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2006
Principal Product Digital labels
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 25,000
Annual Production 2,000,000 Thousand Feet
Production Hrs. Annual 3,510
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $20,949 246,813 kWh $0.08
Electricity Demand $12,373 1,308 kW-months/year $9.46
Electricity Fees $3,071 - $ -
TOTAL ENERGY COSTS $36,393
RECOMMENDED SAVINGS* $446,398 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $442,876
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Increase in Production Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,522
Cost:
$2,400
$3,522 24,288 - - - - - - - - $3,522
24,288
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,219
Cost:
$2,200
$1,503 17,064 $716 72 - - - - - - $1,503
17,064
kWh
$716
72
kW-months/year
-
-
$
-
-
$
-
-
%
03: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$225,208
Cost:
$12,980
$131 1,542 $77 8 $225,000 - - - - - $131
1,542
kWh
$77
8
kW-months/year
$225,000
-
$
-
-
$
-
-
%
04: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$178,334
Cost:
$5,400
$(-1,047) (-12,341) $(-619) (-33) - - - - $180,000 - $(-1,047)
(-12,341)
kWh
$(-619)
(-33)
kW-months/year
-
-
$
-
-
$
$180,000
-
%
05: 4.2120 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$16,864
Cost:
$1,000
$(-1,319) (-14,980) $(-2,857) (-288) - - $21,040 - - - $(-1,319)
(-14,980)
kWh
$(-2,857)
(-288)
kW-months/year
-
-
$
$21,040
-
$
-
-
%
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$20,251
Cost:
$1,000
$(-471) (-5,553) $(-278) (-29) - - - - $21,000 - $(-471)
(-5,553)
kWh
$(-278)
(-29)
kW-months/year
-
-
$
-
-
$
$21,000
-
%
TOTAL RECOMMENDED Savings:
$446,398
Cost:
$24,980
$2,319 10,020 $(-2,961) (-270) $225,000 - $21,040 - $201,000 - $2,319
10,020
kWh
$(-2,961)
(-270)
kW-months/year
$225,000
-
$
$21,040
-
$
$201,000
-
%
TOTAL IMPLEMENTED Savings:
$442,876
Cost:
$22,580
$(-1,203) (-14,268) $(-2,961) (-270) $225,000 - $21,040 - $201,000 - $(-1,203)
(-14,268)
kWh
$(-2,961)
(-270)
kW-months/year
$225,000
-
$
$21,040
-
$
$201,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Increase in Production Electricity Usage Electricity Demand Administrative Changes Primary Raw Material Increase in Production