IAC logo
IAC Assessment: LM0111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2006
Principal Product asphalt shingles
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 167,000
Annual Production 200,000 Thousand Feet
Production Hrs. Annual 8,520
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $343,880 5,567,782 kWh $0.06
Electricity Demand $201,629 10,781 kW-months/year $18.70
Electricity Fees $61,793 - $ -
Natural Gas $944,143 128,830 MMBtu $7.33
TOTAL ENERGY COSTS $1,551,445
RECOMMENDED SAVINGS* $894,746 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $653,120
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$1,018
Cost:
-
- - - - $1,018 120 - - - - - - -
-
kWh
-
-
kW-months/year
$1,018
120
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,109
Cost:
$3,000
- - - - $2,109 237 - - - - - - -
-
kWh
-
-
kW-months/year
$2,109
237
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$879
Cost:
$5,000
$648 9,316 $231 13 - - - - - - - - $648
9,316
kWh
$231
13
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,249
Cost:
$522
$4,578 40,466 $671 48 - - - - - - - - $4,578
40,466
kWh
$671
48
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$235,359
Cost:
$7,000
- - - - - - $4,363 217 $142,776 - $88,220 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,363
217
MMBtu
$142,776
-
$
$88,220
-
$
06: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$650,132
Cost:
-
$5,066 72,770 - - - - - - - - $645,066 - $5,066
72,770
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$645,066
-
$
TOTAL RECOMMENDED Savings:
$894,746
Cost:
$15,522
$10,292 122,552 $902 61 $3,127 357 $4,363 217 $142,776 - $733,286 - $10,292
122,552
kWh
$902
61
kW-months/year
$3,127
357
MMBtu
$4,363
217
MMBtu
$142,776
-
$
$733,286
-
$
TOTAL IMPLEMENTED Savings:
$653,120
Cost:
$8,000
$5,714 82,086 $231 13 $2,109 237 - - - - $645,066 - $5,714
82,086
kWh
$231
13
kW-months/year
$2,109
237
MMBtu
-
-
MMBtu
-
-
$
$645,066
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Administrative Changes