IAC logo
IAC Assessment: LM0113
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0113
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2006
Principal Product frozen food specialties
NAICS 311412 - Frozen Specialty Food Manufacturing
SIC 2038 - Frozen Specialties, Nec
Sales $10,000,000-$50,000,000
# of Employees 480
Plant Area (Sq.Ft.) 75,000
Annual Production 10,000 Tons
Production Hrs. Annual 4,016
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $301,040 3,705,929 kWh $0.08
Electricity Demand $132,195 9,098 kW-months/year $14.53
Electricity Fees $54,318 - $ -
TOTAL ENERGY COSTS $487,553
RECOMMENDED SAVINGS* $385,404 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$333,734
Cost:
$180,000
$33,743 378,029 $17,003 1,180 - - $282,988 - $33,743
378,029
kWh
$17,003
1,180
kW-months/year
-
-
lb
$282,988
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,650
Cost:
$16,170
$11,231 125,805 $5,419 372 - - - - $11,231
125,805
kWh
$5,419
372
kW-months/year
-
-
lb
-
-
$
03: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED Savings:
$35,020
Cost:
$500
- - - - $35,020 502,000 - - -
-
kWh
-
-
kW-months/year
$35,020
502,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$385,404
Cost:
$196,670
$44,974 503,834 $22,422 1,552 $35,020 502,000 $282,988 - $44,974
503,834
kWh
$22,422
1,552
kW-months/year
$35,020
502,000
lb
$282,988
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes