IAC logo
IAC Assessment: LM0114
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0114
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2006
Principal Product wood panel and molding
NAICS 321999 - All Other Miscellaneous Wood Product Manufacturing
SIC 2499 - Wood Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 182
Plant Area (Sq.Ft.) 193,000
Annual Production 16,500,000 Thousand Feet
Production Hrs. Annual 4,267
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $171,421 2,259,773 kWh $0.08
Electricity Demand $155,884 10,167 kW-months/year $15.33
Electricity Fees $30,926 - $ -
TOTAL ENERGY COSTS $358,231
RECOMMENDED SAVINGS* $194,982 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,026
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,544
Cost:
-
$1,704 20,979 $840 59 - - $1,704
20,979
kWh
$840
59
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,286
Cost:
$9,409
$7,262 88,624 $4,024 281 - - $7,262
88,624
kWh
$4,024
281
kW-months/year
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$811
Cost:
-
$539 6,640 $272 19 - - $539
6,640
kWh
$272
19
kW-months/year
-
-
$
04: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$175,670
Cost:
$14,400
$170 2,055 - - $175,500 - $170
2,055
kWh
-
-
kW-months/year
$175,500
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,671
Cost:
$200
$3,178 38,195 $1,493 107 - - $3,178
38,195
kWh
$1,493
107
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$194,982
Cost:
$24,009
$12,853 156,493 $6,629 466 $175,500 - $12,853
156,493
kWh
$6,629
466
kW-months/year
$175,500
-
$
TOTAL IMPLEMENTED Savings:
$8,026
Cost:
$200
$5,421 65,814 $2,605 185 - - $5,421
65,814
kWh
$2,605
185
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes