IAC logo
IAC Assessment: LM0117
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0117
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2006
Principal Product canned pudding
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2032 - Canned Specialties
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 98,234
Annual Production 103,459,305 Pounds
Production Hrs. Annual 4,983
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $525,280 8,192,897 kWh $0.06
Electricity Demand $363,092 19,769 kW-months/year $18.37
Electricity Fees $46,872 - $ -
TOTAL ENERGY COSTS $935,244
RECOMMENDED SAVINGS* $240,866 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $229,392
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Increase in Production
$ kWh $ kW-months/year $ $ $ %
01: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$125,343
Cost:
$20,000
$1,343 18,600 - - $124,000 - - - $1,343
18,600
kWh
-
-
kW-months/year
$124,000
-
$
-
-
%
02: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$86,200
Cost:
$105,000
$3,700 51,000 - - - - $82,500 - $3,700
51,000
kWh
-
-
kW-months/year
-
-
$
$82,500
-
%
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,007
Cost:
$6,550
$1,950 27,000 $3,057 162 - - - - $1,950
27,000
kWh
$3,057
162
kW-months/year
-
-
$
-
-
%
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$15,788
Cost:
$3,000
$6,149 85,176 $9,639 511 - - - - $6,149
85,176
kWh
$9,639
511
kW-months/year
-
-
$
-
-
%
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$6,467
Cost:
$3,500
$2,364 - $4,103 - - - - - $2,364
-
kWh
$4,103
-
kW-months/year
-
-
$
-
-
%
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,061
Cost:
$500
$1,441 19,960 $620 33 - - - - $1,441
19,960
kWh
$620
33
kW-months/year
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$240,866
Cost:
$138,550
$16,947 201,736 $17,419 706 $124,000 - $82,500 - $16,947
201,736
kWh
$17,419
706
kW-months/year
$124,000
-
$
$82,500
-
%
TOTAL IMPLEMENTED Savings:
$229,392
Cost:
$128,500
$12,633 174,736 $10,259 544 $124,000 - $82,500 - $12,633
174,736
kWh
$10,259
544
kW-months/year
$124,000
-
$
$82,500
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Increase in Production