IAC logo
IAC Assessment: LM0118
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0118
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2006
Principal Product sand castings
NAICS 331511 - Iron Foundries
SIC 3321 - Gray And Ductile Iron Foundries
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 55,000
Annual Production 7,739,257 Pounds
Production Hrs. Annual 3,012
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $280,787 5,111,926 kWh $0.05
Electricity Demand $161,496 23,176 kW-months/year $6.97
Natural Gas $91,636 9,778 MMBtu $9.37
TOTAL ENERGY COSTS $533,919
RECOMMENDED SAVINGS* $19,575 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,104
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$8,571
Cost:
$10,004
$2,571 46,475 - - $6,000 - $2,571
46,475
kWh
-
-
kW-months/year
$6,000
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$969
Cost:
$2,578
$670 12,111 $299 43 - - $670
12,111
kWh
$299
43
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,104
Cost:
$425
$3,501 63,247 $603 86 - - $3,501
63,247
kWh
$603
86
kW-months/year
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,931
Cost:
-
$5,931 107,200 - - - - $5,931
107,200
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$19,575
Cost:
$13,007
$12,673 229,033 $902 129 $6,000 - $12,673
229,033
kWh
$902
129
kW-months/year
$6,000
-
$
TOTAL IMPLEMENTED Savings:
$4,104
Cost:
$425
$3,501 63,247 $603 86 - - $3,501
63,247
kWh
$603
86
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes