IAC Assessment: LM0121
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0121
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2006
Principal Product dyed clothing
NAICS 313310 - Textile and Fabric Finishing Mills
SIC 2261 - Finishing Plants, Cotton
Sales $5,000,000-$10,000,000
# of Employees 73
Plant Area (Sq.Ft.) 20,000
Annual Production 4,050,000 Pounds
Production Hrs. Annual 6,480
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,335 1,228,540 kWh $0.06
Electricity Demand $34,244 2,923 kW-months/year $11.72
Electricity Fees $13,945 - $ -
Natural Gas $594,565 59,302 MMBtu $10.03
TOTAL ENERGY COSTS $715,089
RECOMMENDED SAVINGS* $283,624 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,124
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Increase in Production Electricity Usage Electricity Demand Natural Gas Water Consumption Increase in Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ %
01: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$183,000
Cost:
$2,160
$2,260 38,392 - - $18,580 1,853 $6,637 - $155,523 - $2,260
38,392
kWh
-
-
kW-months/year
$18,580
1,853
MMBtu
$6,637
-
Tgal
$155,523
-
%
02: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$91,500
Cost:
$200
$2,260 38,392 - - $18,580 1,853 $6,637 - $64,023 - $2,260
38,392
kWh
-
-
kW-months/year
$18,580
1,853
MMBtu
$6,637
-
Tgal
$64,023
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,390
Cost:
$10,233
$3,552 68,882 $1,838 141 - - - - - - $3,552
68,882
kWh
$1,838
141
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
%
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,734
Cost:
$3,100
- - - - $3,734 372 - - - - -
-
kWh
-
-
kW-months/year
$3,734
372
MMBtu
-
-
Tgal
-
-
%
TOTAL RECOMMENDED Savings:
$283,624
Cost:
$15,693
$8,072 145,666 $1,838 141 $40,894 4,078 $13,274 - $219,546 - $8,072
145,666
kWh
$1,838
141
kW-months/year
$40,894
4,078
MMBtu
$13,274
-
Tgal
$219,546
-
%
TOTAL IMPLEMENTED Savings:
$9,124
Cost:
$13,333
$3,552 68,882 $1,838 141 $3,734 372 - - - - $3,552
68,882
kWh
$1,838
141
kW-months/year
$3,734
372
MMBtu
-
-
Tgal
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ %
Electricity Usage Electricity Demand Natural Gas Water Consumption Increase in Production Electricity Usage Electricity Demand Natural Gas Water Consumption Increase in Production