Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2007
Principal Product plated metal
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 52,000
Annual Production 50,000 Pounds
Production Hrs. Annual 6,720
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $430,111 4,696,669 kWh $0.09
Electricity Demand $112,126 9,149 kW-months/year $12.26
Electricity Fees $22,748 - $ -
Natural Gas $225,567 23,982 MMBtu $9.41
TOTAL ENERGY COSTS $790,552
RECOMMENDED SAVINGS* $67,742 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,533
Cost:
$33,000
$9,741 106,416 $5,670 401 - - $122 - - - $9,741
106,416
kWh
$5,670
401
kW-months/year
-
-
MMBtu
$122
-
$
-
-
$
02: 2.2514 COVER OPEN TANKS Savings:
$7,790
Cost:
$1,800
- - - - $7,790 901 - - - - -
-
kWh
-
-
kW-months/year
$7,790
901
MMBtu
-
-
$
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$6,789
Cost:
$20,000
$6,789 56,036 - - - - - - - - $6,789
56,036
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$37,630
Cost:
$1,000
$2,355 26 - - - - - - $35,275 - $2,355
26
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$35,275
-
$
TOTAL RECOMMENDED Savings:
$67,742
Cost:
$55,800
$18,885 162,478 $5,670 401 $7,790 901 $122 - $35,275 - $18,885
162,478
kWh
$5,670
401
kW-months/year
$7,790
901
MMBtu
$122
-
$
$35,275
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Primary Product