IAC logo
IAC Assessment: LM0125
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0125
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2007
Principal Product aluminum ingots
NAICS 331314 - Secondary Smelting and Alloying of Aluminum
SIC 3341 - Secondary Nonferrous Metals
Sales $10,000,000-$50,000,000
# of Employees 20
Plant Area (Sq.Ft.) 20,000
Annual Production 18,000,000 Pounds
Production Hrs. Annual 5,280
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,169 306,202 kWh $0.18
Electricity Demand $16,063 1,054 kW-months/year $15.24
Electricity Fees $7,148 - $ -
Natural Gas $236,628 26,278 MMBtu $9.00
TOTAL ENERGY COSTS $314,008
RECOMMENDED SAVINGS* $174,325 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $91,707
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,003
Cost:
$2,604
$1,182 12,192 $821 55 - - - - - - $1,182
12,192
kWh
$821
55
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 4.6510 INSTALL BACK-UP EQUIPMENT Savings:
$20,000
Cost:
$20,000
- - - - - - - - $20,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$20,000
-
$
03: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$89,704
Cost:
$11,000
$2,640 28,509 - - $23,064 2,626 $64,000 - - - $2,640
28,509
kWh
-
-
kW-months/year
$23,064
2,626
MMBtu
$64,000
-
$
-
-
$
04: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$62,618
Cost:
$40,000
- - - - $62,618 7,130 - - - - -
-
kWh
-
-
kW-months/year
$62,618
7,130
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$174,325
Cost:
$73,604
$3,822 40,701 $821 55 $85,682 9,756 $64,000 - $20,000 - $3,822
40,701
kWh
$821
55
kW-months/year
$85,682
9,756
MMBtu
$64,000
-
$
$20,000
-
$
TOTAL IMPLEMENTED Savings:
$91,707
Cost:
$13,604
$3,822 40,701 $821 55 $23,064 2,626 $64,000 - - - $3,822
40,701
kWh
$821
55
kW-months/year
$23,064
2,626
MMBtu
$64,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost