Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Louisiana State University |
---|---|
Assessment Year | 2023 |
Principal Product | Hotel |
NAICS | 721110 - Hotels (except Casino Hotels) and Motels |
SIC | 7011 - Hotels And Motels |
Sales | <$500,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 68,239 |
Annual Production | 1 Units |
Production Hrs. Annual | 8,760 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,308,071 | 24,248,200 | kWh | $0.10 |
Electricity Demand | $621,509 | 59,480 | kW-months/year | $10.45 |
Natural Gas | $559,240 | 48,743 | MMBtu | $11.47 |
TOTAL ENERGY COSTS | $3,488,820 | |||
RECOMMENDED SAVINGS* | $476,534 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $258,476 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $56,174 Cost: $1,000 |
$56,174 | 591,300 | - | - |
$56,174 591,300 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,665 Cost: $1,400 |
$3,665 | 38,579 | - | - |
$3,665 38,579 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $189,746 Cost: $142,240 |
$189,746 | 1,997,324 | - | - |
$189,746 1,997,324 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING |
Savings: $6,749 Cost: $10,831 |
$6,749 | 71,044 | - | - |
$6,749 71,044 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $8,548 Cost: $14,800 |
$8,548 | 89,980 | - | - |
$8,548 89,980 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE |
Savings: $193,754 Cost: $552,840 |
$193,754 | 2,039,520 | - | - |
$193,754 2,039,520 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $17,898 Cost: $60,000 |
- | - | $17,898 | 1,560 |
- - kWh |
$17,898 1,560 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $476,534 Cost: $783,111 |
$458,636 | 4,827,747 | $17,898 | 1,560 | $458,636 4,827,747 kWh |
$17,898 1,560 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $258,476 Cost: $568,640 |
$258,476 | 2,720,800 | - | - | $258,476 2,720,800 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |