Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Louisiana State University |
---|---|
Assessment Year | 2024 |
Principal Product | Lubricating Fluids |
NAICS | 324191 - Petroleum Lubricating Oil and Grease Manufacturing |
SIC | 2992 - Lubricating Oils And Greases |
Sales | $50,000,000-$100,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 619,542 |
Annual Production | 180,000,000 Units |
Production Hrs. Annual | 4,625 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,329,976 | 16,276,800 | kWh | $0.08 |
Electricity Demand | $156,020 | 37,317 | kW-months/year | $4.18 |
Natural Gas | $265,295 | 92,803 | MMBtu | $2.86 |
TOTAL ENERGY COSTS | $1,751,291 | |||
RECOMMENDED SAVINGS* | $344,165 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $204,127 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #1 | Personnel Changes | One-time Revenue or Avoided Cost | Primary Product | Electricity Usage | Electricity Demand | Fuel Oil #1 | Personnel Changes | One-time Revenue or Avoided Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS |
Savings: $3,278 Cost: - |
$3,278 | 39,976 | - | - | - | - | - | - | - | - | - | - |
$3,278 39,976 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $11,023 Cost: $50 |
$11,023 | 134,432 | - | - | - | - | - | - | - | - | - | - |
$11,023 134,432 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,417 Cost: $135 |
$1,417 | 17,279 | - | - | - | - | - | - | - | - | - | - |
$1,417 17,279 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $44,207 Cost: $25,301 |
$39,043 | 476,135 | $5,164 | 1,235 | - | - | - | - | - | - | - | - |
$39,043 476,135 kWh |
$5,164 1,235 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $155,225 Cost: $550,000 |
$4,525 | 55,181 | - | - | - | - | $148,000 | - | $2,700 | - | - | - |
$4,525 55,181 kWh |
- - kW-months/year |
- - MMBtu |
$148,000 - $ |
$2,700 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS |
Savings: $129,015 Cost: $600,000 |
- | - | - | - | $(-7,660) | (-296) | - | - | $1,675 | - | $135,000 | - |
- - kWh |
- - kW-months/year |
$(-7,660) (-296) MMBtu |
- - $ |
$1,675 - $ |
$135,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $344,165 Cost: $1,175,486 |
$59,286 | 723,003 | $5,164 | 1,235 | $(-7,660) | (-296) | $148,000 | - | $4,375 | - | $135,000 | - | $59,286 723,003 kWh |
$5,164 1,235 kW-months/year |
$(-7,660) (-296) MMBtu |
$148,000 - $ |
$4,375 - $ |
$135,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $204,127 Cost: $575,436 |
$48,263 | 588,571 | $5,164 | 1,235 | - | - | $148,000 | - | $2,700 | - | - | - | $48,263 588,571 kWh |
$5,164 1,235 kW-months/year |
- - MMBtu |
$148,000 - $ |
$2,700 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #1 | Personnel Changes | One-time Revenue or Avoided Cost | Primary Product | Electricity Usage | Electricity Demand | Fuel Oil #1 | Personnel Changes | One-time Revenue or Avoided Cost | Primary Product |